My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
116
>
2200 - Hazardous Waste Program
>
PR0527093
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2022 3:36:45 PM
Creation date
1/5/2022 2:40:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0527093
PE
2220
FACILITY_ID
FA0015977
FACILITY_NAME
Fast Lane Central Valley
STREET_NUMBER
116
STREET_NAME
ROTH
STREET_TYPE
Rd
City
Lathrop
Zip
95330
APN
196-02-020
CURRENT_STATUS
01
SITE_LOCATION
116 Roth Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Return to Compliance Statement: <br />Inspection Date: June 23, 2008 <br />#11- A hazardous waste number was applied for and obtained by July 03, 2009 and a copy of this is <br />attached to this statement. The EPA number is CAL000334208. <br />#20- All hazardous waste containers are kept is a secure drum that is properly sealed from the elements. <br />#88- All hazardous materials are being managed by Evergreen Environmental Services. Waste is not <br />being stored onsite beyond the maximum allowable time. <br />UST Inspection Report: <br />#4- CFO letter was submitted to the EHD and an updated copy is being submitted the EHD with this <br />statement. <br />#7- Manager has been trained to update and maintain records. <br />#23- Owner has designated Walton Engineering to maintain the monthly DO inspections and training of <br />all employees. <br />#24- The annual monitoring certification was started in October 2008. The several tests failed at that <br />time and was completed in December 2008 after several parts were replaced and re -certified. <br />#25- The annual line leak detector test was done in October 2008. The test failed as a result of two failed <br />FE Petro line leak detectors. In December the failed items were replaced and retested for compliance. <br />#26- Spill containment testing was conducted in October 2008. Some of the sensors failed the test but <br />were replaced and pass the final testing. <br />Hardeep Gill <br />Project Manager <br />707-326-0369 <br />
The URL can be used to link to this page
Your browser does not support the video tag.