My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
7611
>
2300 - Underground Storage Tank Program
>
PR0231511
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 9:01:45 AM
Creation date
1/6/2022 8:40:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231511
PE
2361
FACILITY_ID
FA0003695
FACILITY_NAME
ESTES TRUCKING
STREET_NUMBER
7611
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17705029
CURRENT_STATUS
01
SITE_LOCATION
7611 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7611 South Airport Way PR0231511 <br /> May 6, 2022 Program: UST <br /> PHOTO 2: Incorrect test dates for the monitoring certification, spill container and overfill prevention testing on the designated operator inspection report <br /> dated 12/17/2021. <br /> Underground Storage Tank <br /> Designated UST Operator isual Inspection Report <br /> 10. TESTING AND MAINTENANCE Yes No Nq Date last <br /> pertorrned , <br /> Has monitoring system certification been completed within the past <br /> "I,r/V 12 months? 0 ❑ 512812020 <br /> Has spill container testing been completed within the past 13E`"a'i rr 12 months? 512812020 <br /> Ing Has overfill prevention equipment inspection been completed within ❑ C3 ❑ 41412019 <br /> the past 36 months? <br /> L315111 Has secondary containment testing been completed within the past (] ❑ ❑ 911012019 <br /> 36 months? <br /> v Has tank tightness testing been completed within required ❑ ❑ O <br /> timeframes? <br /> Has line tightness testing been completed within the required ❑ ❑ ❑ <br /> �� _ timeframes? <br /> Other Test/Maintenance: ❑ ❑ <br /> Other Test/Maintenance: ❑ ❑ <br /> Other Test/Maintenance: ❑ ❑ ❑✓ <br /> 11. FACILITY EMPLOYEE TRAINING Yes No <br /> Have all individuals performing facility employee duties received the required facility ❑ ❑ <br /> employee training within the past 12 months? <br /> 13. COMMENTS <br /> This section may be used to record comments or observations that are not current com fiance <br /> deficiencies. <br /> ling <br /> Last <br /> MSC <br /> RecA <br /> /RRen <br /> t�GTt <br /> 11 answers marked"No"must be described by the designated UST o orator in section 3. <br /> Page 4 of 4 <br /> Lydia Baker, SR. REHS Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.