Laserfiche WebLink
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID one OPE per column T-1/ Diesel <br /> Are both vent and tank riser piping ❑✓ Yes ❑Yes ❑Yes ❑Yes <br /> secondarily contained? ❑ No ❑ No ❑ No ❑ No <br /> OPE Model 798591901 <br /> What is the OPE response when activated? 0 Shut off ❑ Shut off ❑ Shut off ❑ Shut off <br /> (Check all that apply.) Flow Flow Flow Flow <br /> ❑ Restricts ❑ Restricts ❑ Restricts ❑ Restricts <br /> Flow Flow Flow Flow <br /> ❑ Audible ❑ Audible ❑ Audible ❑ Audible <br /> Alarm Alarm Alarm Alarm <br /> ❑ Visual ❑ Visual ❑ Visual ❑ Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping ❑ Yes ❑ Yes ❑ Yes ❑ Yes <br /> that may interfere with the OPE operation? 0 No ❑ No ❑ No ❑ No <br /> At what level in the tank is the OPE set to 43 <br /> activate? (Inches from bottom of tank) <br /> What is the percent capacity of the tank at 95 <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to ✓❑ Yes ❑Yes ❑Yes ❑Yes <br /> respond when the stored substance ❑ No ❑ No ❑ No ❑ No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results <br /> ❑✓ Pass ❑ Pass ❑ Pass ❑ Pass <br /> ❑ Fail ❑ Fail ❑ Fail ❑ Fail <br /> 8. COMMENTS <br /> Are flow restrictors installed? ❑ Yes ❑ Yes ❑ Yes ❑ Yes <br /> 0 No ❑ No ❑ No ❑ No <br /> Describe all results marked "Fail'and each proposed remedy. <br /> * Mark here if: <br /> ❑ Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />