My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
816
>
2300 - Underground Storage Tank Program
>
PR0231470
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2022 4:51:59 PM
Creation date
1/6/2022 3:55:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231470
PE
2361
FACILITY_ID
FA0003911
FACILITY_NAME
VAN DE POL ENTERPRISES INC
STREET_NUMBER
816
Direction
E
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102010
CURRENT_STATUS
01
SITE_LOCATION
816 E FRONTAGE RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTIONEQUIPMENT DETAILS <br /> Tank ID (one OPE per column) 87 91 DIESEL <br /> Are both vent.and tank riser piping. ❑Yes- ❑Yes ❑.Yes. 1J.Yes.. <br /> secondarily contained? ❑ No p No 0 No ❑ No <br /> OPE Model FF DEFENDER FF DEFENDER FF DEFENDER <br /> What is the OPE response when activated? p Shut off C7 Shut off p Shut off ❑ Shut off <br /> (Check all that apply.) Flow Flow Flow Flow <br /> ❑Restricts [Restricts CjRestricts ❑Restricts <br /> Flow Flow Flow Flow <br /> ❑ Audible ❑ Audible ❑ Audible ❑ Audible <br /> Alarm Alarm Alarm Alarm <br /> ❑ Visual ❑ Visual ❑ Visual ❑ Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping 0 Yes* ❑ Yes* ❑ yes* ❑ Yes* <br /> that may interfere with the OPE operation? p No C7 No 2 No ❑ No <br /> At what level in the tank is the OPE set to 9.l.5 98.598. <br /> activate? Inches from bottom of tank <br /> What is the percent capacity of the tank at 93.3 94. 1 94. 1 <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to 21 Yes 0 Yes p Yes ❑ Yes <br /> respond when the stored substance <br /> ❑ No ❑ No ❑ No ❑ No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results E Pass 0 Pass p Pass ❑ Pass <br /> ❑ Fail ❑ Fail ❑ Fail ❑ Fail <br /> 8.` COMMENTS <br /> Describe all results marked "Fail"and each proposed remedy. <br /> ALL PASSED <br /> * Mark here if: <br /> ❑ Flow restdctors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup reports) <br /> Page 2of2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.