Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer p Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure 0 Vacuum ❑ Hydrostatic <br /> Test Equipment Used:4"Dial Gauge <br /> Tank ID UE046U002 <br /> Tank Manufacturer Modern Welding <br /> Tank Capacity 4000 gal <br /> Test Start Time 9:06am <br /> Initial Reading -10" Hg <br /> Test End Time 10:06am <br /> Final Reading -10" Hg <br /> Change in Reading 0 <br /> Pass/Fail Criteria 0 <br /> Tightness Test Results ❑✓ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ F2LJj <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ❑✓ Industry Standard ❑ Professional Engineer <br /> Test Type ❑✓ Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: 4"Dial Gauge <br /> Pipe Run ID Supply/Return <br /> Pipe Manufacturer Enviroflex <br /> Test Start Time 12:45pm <br /> Initial Reading 5 psi <br /> Test End Time 1:45pm <br /> Final Reading 5 psi <br /> Change in Reading 0 <br /> Pass/Fail Criteria 0 <br /> Tightness Test Results ❑✓ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />