My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLEY
>
1812
>
2300 - Underground Storage Tank Program
>
PR0231881
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2022 1:29:53 PM
Creation date
1/6/2022 3:59:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231881
PE
2371
FACILITY_ID
FA0003946
FACILITY_NAME
AT&T California - UG010
STREET_NUMBER
1812
STREET_NAME
COLEY
STREET_TYPE
Ave
City
Escalon
Zip
95320
APN
22715414
CURRENT_STATUS
01
SITE_LOCATION
1812 Coley Ave
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 5 . MONITORING SYSTEM AND PROGRAMMING <br /> A separate Monitoring System Certification Form must be prepared for each control panel. <br /> Make of Monitoring System Model of Monitoring System Software Version Installed <br /> Control Panel Control Panel <br /> Veeder- Root TLS 350 120 . 00 <br /> Attach the post- certification reports if the monitoring system is capable of generating Yes No NA <br /> either; Monitoring System Set- up E✓ Alarm History Report <br /> All monitoring equipment is operational per manufacturer' s specifications ? ❑✓ ❑ <br /> Secondary containment systems are free of damage , debris , or liquid ? 0 ❑ <br /> Are the audible and visual alarms operational ? EZI ❑ <br /> All sensors have been : 1 ) visually inspected for wiring kinks , breaks and residual 0 ❑ ❑ <br /> buildup on floats ; and 2 ) tested for functionality and confirmed operational ? <br /> Are all sensors installed to detect a release at the earliest opportunity in the El ❑ ❑ <br /> secondary containment? <br /> The monitoring system set- up was reviewed , and proper settings confirmed ? El ❑ ❑ <br /> Was the monitoring control panel ' s backup battery visually inspected , functionally 0 ❑ ❑ <br /> tested , and confirmed operational ? <br /> Does the flow of fuel stop at the dispenser if a release is detected in the under- ❑ ❑ 0 <br /> dispenser containment? <br /> Does the turbine automatically shut down if the piping secondary containment ❑ ❑ Fv] <br /> monitoring system fails to operate or is electrically disconnected ? <br /> Does the turbine automatically shut down if the piping secondary containment <br /> monitoring system detects a release ? Which sensors initiate positive shut down ? ❑ ❑ 0 <br /> ( Check all that apply) ❑ Sump ❑ UDC <br /> If monitoring system alarms are relayed to a remote monitoring center , is all 0 ❑ ❑ <br /> communication equipment operational ? <br /> Describe all answers marked "No " or "Fail" and proposed remedy in Section 9 . <br /> List all monitoring equipment either replaced or repaired in Section 9 <br /> Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.