Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10 . MONITORING SITE PLAN <br /> Date site plan was prepared: <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form . The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> MonitoringPlan Site Map <br /> -- Drawing Drawing NOT to Scale <br /> Went Sump <br /> wl Sensor ( L3) AT &T building <br /> 794380 =208FFFFFFFFFFFFFFFFFF <br /> Annular Sensor <br /> ( L1 ) 794390 -420 TLS 350 Plus <br /> �i ( 1st Floor) <br /> > F J -- Piping Tray <br /> Engine <br /> C) I Sensor ( 1.5) <br /> 794390-420 <br /> ( Overfills - <br /> V) I - I Alarm = <br /> � � I <br /> r 4 Fuel Transition Sump <br /> Lines w/ Sensor ( L4) <br /> 794380 -208 <br /> Fill t Piping Sump <br /> w/ Sensor ( L2) IF <br /> 794380-208 /V <br /> Spill Bucket <br /> ATG <br /> Page 6 of 6 <br />