Laserfiche WebLink
Underground Storage Tank <br />Secondary Containment Testing Report Form <br />8. SUMP/UDC TEST <br />Test Method Developed by ❑ Manufacturer ❑✓ Industry Standard ❑ Professional Engineer <br />Test Type ❑ Pressure ❑ Vacuum ❑✓ Hydrostatic <br />Test Equipment Used: INcoN TS -STS <br />Sump/UDC ID <br />UG010U001 Fill/Piping <br />UG010U001 P Trans <br />UG010U001 V Sump <br />Sump Manufacturer <br />Modern Welding <br />Western Fiberglass <br />Western Fiberglass <br />Sump Depth (inches) <br />74" <br />42" <br />32" <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />34" <br />16" <br />8" <br />Test Start Time <br />9:50 AM <br />9:00 AM <br />9:00 AM <br />Initial Reading <br />4.5640 <br />5.7830 <br />6.1292 <br />Test End Time <br />10:05 AM <br />9:15 AM <br />9:15 AM <br />Final Reading <br />4.5638 <br />5.7830 <br />6.1284 <br />Change in Reading <br />0.0002 <br />0.0000 <br />0.0008 <br />Pass/Fail Criteria <br />0.002 <br />0.002 <br />0.002 <br />Tightness Test Results <br />p Pass ❑ Fail <br />p Pass ❑ Fail <br />0 Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Sump/UDC ID <br />Sump Manufacturer <br />Sump Depth (inches) <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />Test Start Time <br />Initial Reading <br />Test End Time <br />Final Reading <br />Change in Reading <br />Pass Fail Criteria <br />Tightness Test Results <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass❑I Fail <br />Additional copies of this page may be attached. <br />All tests marked "Fail" and any repairs made before or during the tightness test must be described in <br />the COMMENTS section. <br />Page 3 of 5 <br />