Laserfiche WebLink
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) 87A 87B 91 DSL <br /> Are both vent and tank riser piping ❑ Yes ❑ Yes ❑ Yes ❑ Yes <br /> secondarily contained? ® No ® No ® No ® No <br /> OPE Model FFS FFS FFS FFS <br /> What is the OPE response when activated? ® Shut off ® Shut off ® Shut off ® Shut off <br /> (Check all that apply.) Flow Flow Flow Flow <br /> ❑Restricts ❑Restricts ❑Restricts ❑Restricts <br /> Flow Flow Flow Flow <br /> ❑ Audible ❑ Audible ❑ Audible ❑ Audible <br /> Alarm Alarm Alarm Alarm <br /> ❑ Visual ❑ Visual ❑ Visual ❑ Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping ❑ Yes* ❑ Yes* ❑ Yes* ❑ Yes* <br /> that may interfere with the OPE operation? ❑ No ❑ No ❑ No ❑ No <br /> At what level in the tank is the OPE set to 85" 83 3/8" 82 7/8" 82 1/4" <br /> activate? Inches from bottom of tank <br /> What is the percent capacity of the tank at 98% 97% 96% 96% <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to ❑ Yes ❑ Yes ❑ Yes ❑ Yes <br /> respond when the stored substance ® No ® No ® No ® No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results ❑ Pass ❑ Pass ❑ Pass ❑ Pass <br /> ® Fail ® Fail ® Fail ® Fail <br /> 8. COMMENTS <br /> Describe all results marked "Fail"and each proposed remedy. <br /> All 4 tanks have their shut off valves higher than 95%. The Vent lines are single wall <br /> requiring them to be below 95%. Drop tube shut off valves will need to be replaced. Ball <br /> floats need to be confirmed for height/removal. <br /> * Mark here if: <br /> ❑ Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />