My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2016-2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
CORRESPONDENCE_2016-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 10:07:34 AM
Creation date
1/7/2022 10:13:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2016-2017
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
63 <br />Ll <br />All products are sold on the understanding that the user is solely responsible for determining <br />their suitability for the intended use and for proper use and disposal of the product. All <br />information given and recommendations made herein are based upon our research and are <br />believed to be accurate, but no guarantee, either expressed or implied, is made with respect <br />thereto. CETCO MAKES NO WARRANTY OF MERCHANTABILITY OR SUITABILITY FOR ANY <br />PARTICULAR PURPOSE IN CONNECTION WITH ANY SALE OF THE PRODUCTS DESCRIBED <br />HEREIN. Inconsistent terms and conditions contained in Buyer's purchase order shall not be <br />binding on CETCO unless reflected in writing signed by CETCO's representative. <br />From: Nguyentan, Thienan [mailto:tnguyentan@sigov.org] <br />Sent: Thursday, April 28, 2016 12:58 PM <br />To: 'GEORGE.DUGAN@CETCO.COM' <br />Cc: Acevedo,luan <br />Subject: Cetco Crumbles #8 - Please advise on Hydration Wait Time <br />Good morning George, <br />Could you please advise us on the wait time for hydration of the attached bentonite (Crumbles #8)? We're using this <br />product on site for soil gas monitoring wells and placing 5' bentonite section at a time with adding approx. 5 gals of <br />water for hydration. We were told by one of your representatives that it should only take 5-10 mins. We're looking for <br />a written recommendation from Cetco on the hydration wait time for: <br />1. Between 5' bentonite/crumbles sections <br />2. Between 5' bentonite/crumbles section and 3/8" pea gravel section. <br />Please do not hesitate to give me a call with any questions. Your prompt attention to this request is greatly appreciated. <br />Thank you. <br />Regards, <br />Thienan Nguyentan, PE <br />Engineer IV <br />SJCPW Field Engineering <br />1810 East Hazelton Ave. <br />Stockton, CA 95205 <br />Office: 209-953-7422 <br />Cell: 209-623-5561 <br />
The URL can be used to link to this page
Your browser does not support the video tag.