Laserfiche WebLink
11 <br />TABLE 3 <br />First Quarter 2016 <br />Structure Monitoring for Landfill Gas Results <br />Foothill Sanitary Landfill <br />Monitoring Date: February 1, 2016 Monitoring Technician: M. Palis <br />Building and Monitoring Location <br />Methane <br />(% by vol) (% <br />Carbon <br />Dioxide <br />by vol) (% <br />Oxygen <br />by vol) (% <br />Balance <br />Gas Note <br />by vol) <br />Maintenance Building (Electrical Conduit) <br />0.0M01 <br />21.4 <br />78.5 <br />Maintenance Building (Interior) <br />0.021.3 <br />78.6 <br />Managers Residence (Electrical) <br />0.021.0 <br />78.8 <br />Managers Residence (Interior) <br />0.020.9 <br />78.0 Vacant now <br />Managers Residence Crawl Space <br />0.0 <br />0.1 <br />20.7 <br />79.2 <br />Scalehouse (Electrical Conduit) <br />0.0 <br />0.1 <br />20.3 <br />79.6 <br />Scalehouse (Interior) <br />0.0 <br />0.1 <br />20.0 <br />79.9 <br />* Compliance Level: <br />Methane gas to be less than1.25 percent by volume. <br />N:\1Foothill\LFG Migration Monitoring\2016\1st Qtr\ <br />FH First Qtr 2016 Structures <br />