My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2016-2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
CORRESPONDENCE_2016-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 10:07:34 AM
Creation date
1/7/2022 10:13:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2016-2017
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />1 0 <br />e <br />YEMW 11CUT <br />D <br />DRILL PROGRAM <br />This program has been modified to meet the criteria outlined in the FOOTHILL LANDFILL <br />SANITARY GAS LANDFILL GAS SYSTEM UPGRADE PHASE 1 bid specification package <br />received January 11, 2016 and subsequent addenda. <br />Drilling Equipment— Drill equipment will include: Tsi Terra Sonic 150T drilling rig, pipe truck, <br />drill rods, tremie pipe, welder, fuel cell, and trailers. <br />Borehole Hole Drilling — The existing well will be over drilled and removed with sonic rig. The <br />borehole will be continued with 8"-10" Sonic Drilling Casings to total depth. No cuttings will be <br />generated other than obtained from soil sampling through the inside of the sonic casings. Soil <br />Cuttings will be removed from the borehole using 6-8" samplers. <br />Well Construction — Well casing and screens will consist of 2" Sch80 PVC. 3 wells will be <br />installed within each clustered borehole. Pea gravel filter pack will be provided in bulk. Medium <br />bentonite chips will be placed between nested well casings and above the uppermost screen. <br />Placement of the pea gravel filter pack and bentonite seal will be via tremie pipe and <br />measurements with a downhole tape will be made outside the tremie every 30' or as needed. <br />Surface Completion — The well will be completed with a 14" square X 5' long monument <br />casing encased in 2' of concrete. <br />9460 Lucas Ranch Rd. • Rancho Cucamonga, CA • Ph. (909) 912-1890 9 Fax: (909) 944-9301 <br />
The URL can be used to link to this page
Your browser does not support the video tag.