Table 1 <br /> Preliminary Closure Cost Estimate <br /> Foothill Sanitary Landfill <br /> San Joaquin County, California <br /> Items Quantity Units Unit Cost Extn <br /> FINAL COVER SOIL <br /> 1 Preparation of landfill to receive cover(final grading) 665 AC $1,200 $798,000 <br /> 2 Evapotranspiration Layer(on-site soils) 4,827,900 CY $3.46 $16,704,534 <br /> 3 Vegetation(mulch and hydroseeding) 700 AC $3,860 $2,702,000 <br /> Final Cover Soil Subtotal $20,204,534 <br /> MONITORING SYSTEM <br /> 4 Perimeter Landfill Gas Monitoring System 4 EACH $38,250 $153,000 <br /> 5 Groundwater Monitoring System 2 EACH $37,200 $74,400 <br /> 6 Leachate Control System 1 EACH $50,000 $50,000 <br /> Monitoring Systems Subtotal $277,400 <br /> LFG CONTROL <br /> 7 Disabling and Rebuilding Gas System LS $687,173 $687,173 <br /> 8 System expansion at Closure N/A $0 <br /> LFG Control System Subtotal MESM $687,173 <br /> SITE IMPROVEMENTS <br /> 9 Drainage Structures 32,000 LF $7.27 $232,711 <br /> 10 Security Measures 5,000 LF $17.50 $87,500 <br /> 11 Survey Monuments 4 EACH $2,000 $8,000 <br /> 12 Dismantle Structures 5,500 SF $7.00 $38,500 <br /> 13 Decommission Environmental Monitoring System None planned for closure $0 <br /> Other Site Improvement Subtotal $366,711 <br /> Total Construction Cost $21,535,819 <br /> PROFESSIONAL SERVICES <br /> 14 Engineering(Design and Bid Documents) 2% of updated construction cost $430,700 <br /> 15 Topographic and Boundary Survey 1 LS I $9,561 $9,561 <br /> 16 Construction Quality Assurance 5% of final over construct cost $1,010,227 <br /> Professional Services Subtotal $1,450,500 <br /> TOTAL ESTIMATED CLOSURE COST $22,986,319 <br /> CONTINGENCY(20%) $4,597,264 <br /> TOTAL $27,583,582 <br /> All Costs are in 2015 dollars. SF=square foot AC=acre <br /> CY=cubic yard <br /> LS=lump sum <br /> N:\1Foothill\CalRecycle\2015 JTD Review\2015 JTD Docs\2015 FH Clo-PostClo Tables2xis,Table 1 <br /> Foothill Sanitary Landfill Public Works/Solid Waste County of San Joaquin <br /> Preliminary PCPM Plan Page 1 Revised January 27,2017 <br />