Laserfiche WebLink
Table 2 <br /> Annual Postclosure Maintenance Cost Estimate <br /> Foothill Sanitary Landfill <br /> San Joaquin County, California <br /> Items Quantity Units Unit Cost Subtotals <br /> COVER MAINTENANCE <br /> 1 ET Soil cap 159,321 CY $6.92 $1,102,499 <br /> 2 Hydroseed 22 AC $3,860 $86,000 <br /> 3 Mowing 673 AC $200 $134,600 <br /> Cover Repair Subtotal $1,323,099 <br /> LEACHATE COLLECTION <br /> 4 Operation, Maintenance, Disposal 10 EACH $11,360 $113,603 <br /> 5 Leachate Sampling 10 EACH $504 $5,040 <br /> 6 Leachate Analysis 10 EACH $556 $5,560 <br /> Leachate Collection Systems Subtotal $124,203 <br /> LFG(MIGRATION)MONITORING <br /> 7 Soil Gas Measurement 1 LS $5,568 $5,568 <br /> 8 Soil Gas VOC Analysis 1 LS $7,000 $7,000 <br /> 9 Surface Emission Monitoring 1 LS $54,000 $54,000 <br /> LFG Emissions Monitoring Subtotal $66,568 <br /> LFG CONTROL SYSTEM <br /> 10 Maintenance and Operation 1 LS $2,819,000 $2,819,000 <br /> LFG System Subtotal $2,819,000 <br /> GROUNDWATER AND SURFACE WATER MONITORING <br /> 11 Groundwater and Surface Water Sampling 24 EACH $5,089 $122,126 <br /> 12 Analysis(Included in No. 10 above) <br /> 13 Monitoring Well Maintenance 24 EACH $763 $18,312 <br /> Groundwater and Surface Water Monitoring Subtotal $140,438 <br /> VADOSE ZONE MONITORING <br /> 14 Vadose zone sampling 20 EACH $126 $2,520 <br /> 15 Analysis 20 EACH $200 $4,000 <br /> Vadose Zone Monitoring Subtotal $6,520 <br /> DRAINAGE <br /> 16: See Note 1 LS $10,277 $10,277 <br /> Drainage Subtotal $10,277 <br /> SECURITY <br /> 17: See Note 1 LS $2,917 $2,917 <br /> Security Subtotal $2,917 <br /> SETTLEMENT ANALYSIS <br /> 18:Aerial survey 1 LS $15,000 $15,000 <br /> Settlement Analysis Subtotal $15,000 <br /> DECOMMISSIONING <br /> 19: See Note 1 LS $0 $0 <br /> Decommissioning Subtotal $0 <br /> OTHER <br /> 20: Inspections and Record Keeping 100 Hrs $160 $16,016 <br /> Other Subtotal $16,016 <br /> TOTAL ESTIMATED ANNUAL COST $4,524,038 <br /> TOTAL COST OVER 30 YEARS $135,721,150 <br /> AC=acre All costs are in 2015 dollars. <br /> CY=cubic yard Landfill surface area= 673 acres <br /> LS=lump sum ET Cover thickness= 4 feet <br /> Foothill Sanitary Landfill Public Works/Solid Waste <br /> Preliminary PCPM Plan Page 1 County of San Joaquin-Revised January 27,2017 <br />