Laserfiche WebLink
TABLE 3 <br /> First Quarter 2017 <br /> Structure Monitoring for Landfill Gas Results <br /> Foothill Sanitary Landfill <br /> Monitoring Date: March 23, 2017 Monitoring Technician: M. Palis <br /> Carbon Balance <br /> Building and Monitoring Location Methane Dioxide Oxygen Gas Note <br /> (% by vol) (% by vol) (% by vol) (% by vol) <br /> Maintenance Building (Electrical Conduit) 0.0 0.1 20.7 79.2 <br /> Maintenance Building (Interior) 0.0 0.1 20.7 79.2 <br /> Managers Residence (Electrical) 0.0 0.1 20.5 79.4 <br /> Managers Residence (Interior) 0.0 0.1 20.4 79.5 Vacant now <br /> Managers Residence Crawl Space 0.0 0.1 20.4 79.5 <br /> Scalehouse (Electrical Conduit) 0.0 0.1 20.5 j 79.4 <br /> Scalehouse (Interior) 0.0 0.1 20.5 79.4 <br /> * Compliance Level: <br /> Methane gas to be less than1.25 percent by volume. <br /> N:\1 Foothill\LFG Migration Monitoring\2017\1st Qtr\ <br /> FH-1st Qtr LFG Perim Mig Monit 2017 Structures <br />