Laserfiche WebLink
1 B <br />Second Quarter 2017 <br />Structure Monitoring for • <br />Foothill Sanitary Landfill <br />Monitoring Date: April 18, 2017 <br />Building and Monitoring Location <br />Maintenance Building (Electrical Conduit) <br />Maintenance Building (Interior) <br />Managers Residence (Electrical) <br />Managers Residence (Interior) <br />Managers Residence Crawl Space <br />Scalehouse (Electrical Conduit) <br />�S­ca­leh—ouse (Interior) <br />Monitoring Technician: M. Palis <br />Carbon Balance <br />Methane I Dioxide I Oxygen I Gas <br />% by vol) I (% by vol) I (% by vol) I (% by vol) <br />* Compliance Level: <br />Methane gas to be less thanl.25 percent by volume. <br />N:\1 Foothill\LFG Migration Monitoring\2017\2nd Qtr\ <br />FH -2nd Qtr LFG Perim Mig Monit 2017 Structures <br />Note <br />Vacant now <br />CJ <br />