Laserfiche WebLink
6. Installing well plugs and filling sand inside the well enclosure <br />7. Placing A.B. around the well skirt. <br />6.06 WELL DEVELOPMENT <br />Well development includes doing all the work specified here -in, including <br />providing the well development report to the Engineer. Well development will be <br />on the lump sum cost per day as quoted in the bid proposal. <br />6.07 WELL PUMP <br />Payment for each well pump shall be per lump sum cost quoted in the bid <br />proposal. <br />6.08 DISCHARGE TUBING <br />Payment for discharge tubing shall be by the unit price per linear foot quoted in <br />the bid proposal. Payment shall include stainless steel tubing connections and <br />check valve. <br />6.09 MOTOR LEAD <br />Payment for motor lead shall be by the unit price per linear foot quoted in the bid <br />proposal. <br />6.10 SAFETY CABLE BRACKET <br />Payment for each safety cable bracket shall be per lump sum cost quoted in the <br />bid proposal. <br />6.11 WELL CAP <br />Payment for each well cap shall be per lump sum cost quoted in the bid <br />proposal. <br />6.12 PUMP INSTALLATION <br />Payment for each well pump installation shall be per lump sum cost quoted in <br />the bid proposal. <br />6.13 BOLLARDS <br />A. Measurement for payment for installing bollards shall be per the number of <br />bollards installed per the contract figures. <br />San Joaquin County <br />Groundwater Monitoring Well Specifications 13 Public Works Dept <br />Solid Waste Division <br />