Laserfiche WebLink
A. For the purpose of this section, installation refers to placing material in a <br />borehole. Well Installation does not include drilling the borehole. <br />B. Installation of groundwater wells shall be in the presence of EHD inspectors. <br />C. The Engineer will be in charge of scheduling well installation inspections with <br />EHD. Contractor shall not coordinate any inspections with the EHD unless <br />authorized by the Engineer. <br />D. EHD inspection hours are from 9.00 a.m. to 4.00 p.m. each working day. Well <br />installation shall be during EHD's inspection hours. <br />E. Contractor shall provide the Engineer three days' notice for well installation. <br />Engineer will provide two days' notice to EHD. <br />1 Contractor shall confirm with the Engineer the approximate time. <br />Contractor's crew will be ready for the first inspection for a project before <br />24 hours. <br />2. Contractor shall confirm consecutive inspections needed for the project <br />with the Engineer in the field based on the work progress after the first <br />inspection. The Engineer will then schedule inspections with EHD <br />inspector. <br />PART 2 PRODUCTS <br />2.01 GENEQk-L— <br />WE <br />All mater ' ials, shall be new and free of defects. Contractor shall inspect materials <br />before installing. Contractor shall replace defective materials at no additional <br />cost to the County. <br />WELL CASING <br />The well casing shall be schedule 80, flush -threaded polyvinylchloride (PVC). <br />San Joaquin County <br />Groundwater Monitoring Well Specifications 2 Public Works Dept <br />Solid Waste Division <br />