Laserfiche WebLink
r <br /> Monitoring Report Compliance Checklist 5 <br /> f Discharges Regulated by Title 27 and/or Part 258 <br /> approximately 200 feet bgs, and depth of waste is not <br /> known. GW below the unlined Module I flows south- <br /> southeasterly through Module 1. The DMP has no <br /> point of compliance at the downgradient edge of <br /> waste. Staff is unclear as to the future expansion plans <br /> (timing)but nonetheless, shall require the Discharger <br /> to install a minimum of one GW monitoringwell ell at <br /> the downgradient boundary of Module 1 in accordance <br /> with T27, section 20415(a)(b)(B) to satisfy sections <br /> 20420 20425 or 20430. Furthermore staff will <br /> require the Discharger to submit an updated <br /> Engineering eering Feasibility Plan to update the Site <br /> Conceptual Model, increase LFG collection an vadose <br /> zone monitoring, and install a GW monitoring well. <br /> Finding 29 of the WDRs requires the Discharger to <br /> perform an Evalution Monitoring Program if VOCs <br /> are detected in the soil gas probes. <br /> Additional Comments and Recommendations: <br /> RWQCB Staff Signature: _ <br /> Date: 14 Ma 2014 <br />