My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2014-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
CORRESPONDENCE_2014-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 10:06:07 AM
Creation date
1/7/2022 4:19:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2014-2015
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br />9. Volume and physical character of sediment removed, to include changes <br />during development in color orodor. <br />10. Readings of pH, specific conductance, turbidity, DO, oxidation / reduction <br />potential (ORP), and temperature taken before, during, and after <br />development. <br />11. Other information as requested by the Engineer. <br />PART 4 PUMP INSTALLATION <br />A. Contractor shall install the dedicated well pump in each groundwater monitoring <br />well in accordance the manufacture's specification in the presence of the <br />Engineer. Contractor shall tie the lead wire, safety cable and discharge tubing to <br />the casing every five (5) feet with zip ties or as approved by the Engineer. <br />Contractor shall install the well cap and hang the pump in the well casing at the <br />appropriate depth as determined by the Engineer. <br />PART 5 ACCEPTANCE <br />A. County will accept wells installed in accordance to the specifications. County will <br />not accept a well installed without EHD inspection. Contractor will be responsible <br />for damages caused to the well casing due to gross negligence during drilling <br />and well installation. Contractor shall not drop any tools or bailers in the well <br />casing.. <br />B. If the County disapproves a well, then the Contractor shall: <br />1. Repair defective components of the well. If defective components are not <br />repairable, then the Contractor shall abandon that well and install a new <br />well, or re -drill the well found to be unacceptable, at no additional cost to <br />the County. <br />PART 6 MEASUREMENT AND PAYMENT <br />6.01 GENERAL <br />A. Payment shall be full compensation for labor, materials, tools, equipment <br />overhead for each task or line item listed in the bid sheet. <br />B. Partial payment will not be made for each project. <br />C. Payment will be made after the acceptance of the wells by the County. <br />San Joaquin County <br />Groundwater Monitoring Well Specifications 11 Public Works Dept <br />Solid Waste Division <br />
The URL can be used to link to this page
Your browser does not support the video tag.