Laserfiche WebLink
Inspection (Written Response) <br /> 106: We have updated our Site map and have uploaded it to CERS <br /> 109: We have Spoken to our D.O. and have expressed that we need to <br /> Notify EHD when we get a new Operator. We have Submitted a <br /> "Designated Underground Storage Tank Operator Identification Form" <br /> 206: We have obtained a copy of the UST Response plan here on site. <br /> 208: We have Spoken to our staff and have created a plan to Ensure that <br /> we are performing visual inspections at our facility and are including all <br /> of the required information on the reports. <br /> 209: We have updated our facility employee training certificate and have <br /> sent a copy to EHD. <br /> 319: We have Spoken to our team and our D.O ( Afforda — Test) and <br /> expressed that we need to Ensure all future testing is conducted within <br /> the time frames. <br />