Laserfiche WebLink
Inspection (written Response) <br /> 115: I have spoken to our D.0. (Afforda— Test) and have expressed that they need <br /> to take all necessary precautions to ensure testing and submittal of test reports are <br /> preformed in a timely manner. <br /> 118: I have spoken to our D.0. (Afforda— Test) and they will be sending a report <br /> to EHD Immediately. <br /> 203: We have Spoken to our staff and have made sure that we have all <br /> maintenance records for the past 60 months on site. <br /> 208: We have Spoken to our staff and have created a plan to Ensure all designated <br /> operator inspection reports are completed and signed within the required time <br /> frame in the future. <br /> 306: We will be assuring that all sumps and annular spaces are maintained free of <br /> liquid. <br /> 311: We have spoken to our D.O (Afforda— Test) and they will make sure that all <br /> annular sensors are working so the tanks can be monitored. <br /> 318: I have spoken to Elite IV and they will be fixing the component so the 91,87 <br /> and diesel to meet spill container requirements. Elite IV is waiting for permits <br /> before they can fix the problem and our fuel supplier has been notified not to fill <br /> petroleum into the tank until the components have been fixed. <br />