My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3515
>
2300 - Underground Storage Tank Program
>
PR0231210
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2022 7:47:26 AM
Creation date
1/10/2022 2:59:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231210
PE
2361
FACILITY_ID
FA0003747
FACILITY_NAME
Shell Oil Products US - Stockton Terminal
STREET_NUMBER
3515
STREET_NAME
NAVY
STREET_TYPE
Dr
City
Stockton
Zip
95203
APN
161-030-02
CURRENT_STATUS
02
SITE_LOCATION
3515 Navy Dr
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Let me know if you have any questions. <br /> Thanks, <br /> Steve J. Jones <br /> Project Manager-Trading&Supply <br /> Shell Oil Company <br /> 1000 Main Street <br /> Houston,TX 77002 <br /> Tel:+1 832 337 9588 <br /> Cell: +1 832 607 1906 <br /> Email:Steven.J.Jones(a)shell.com <br /> From: Ernest, Frederick [EHD] <fernest@sigov.org> <br /> Sent: Monday, October 11, 202111:00 AM <br /> To:Jones, Steven J SPLC-STD/GA/1<Steven.J.Jones@shell.com> <br /> Cc: Geijer,Theresa A SPLC-STD/HA<theresa.geiier@shell.com>; Katz, Paul A SPLC-STD/AW<paul.katz@shell.com>; <br /> Ramon, Ray O SPLC-STD/HA/1<Ray.Ramon @shell.com> <br /> Subject: 3515 Navy Drive Lift Station Questions <br /> Think Secure.This email is from an external source. <br /> Good morning Steven, <br /> I had more questions on the lift station system installed at 3515 Navy Drive. <br /> 1) Do you have engineer calculations for the concrete lift station for structural integrity? There was only a pad that <br /> was designed to cover the lift station.The fiberglass lift station is not encased in concrete. See civil Drawing (5- <br /> 100) <br /> 2) Where are the drains that feed the lift station? <br /> There are two streams that feed the lift station. See drawing (1-103430) <br /> 1.) Load rack strip drain <br /> 2.) Water draw from the tanks <br /> 3) Is there any liquids from the AST tanks going into the lift station? Yes.Water draws from ASTs. Water draws are <br /> pumped through the lift station. <br /> 4) What does the site do with the petroleum contact water when it is first generated? Contact water is pumped <br /> through the lift station to Above Ground Tank-13 <br /> 5) Is there any treatment of that petroleum contact water at the site? No <br /> 6) Does the lift station include any screens or filters to treat the petroleum contact water? No. <br /> 7) Is the petroleum contact water handled as hazardous waste, or hazardous materials? <br /> Petroleum contact water was shipped under hazardous waste manifest in May 2021,to DeMenno/Kerdoon dba <br /> World Oil Recycling in Compton, CA,where it was treated and recycled in accordance with the 'Certificate of <br /> Treatment/Recycling' (see attached copy of manifest 021324360JJK). <br /> 8) Is the petroleum contact water discharged into the sewer system or the storm water system? No <br /> 9) If the petroleum contact water sent off site, can the site provide any shipping papers, or manifests to indicate <br /> where the petroleum contact water is going to? See attached manifest (021324360JJK)with Certificate of <br /> Treatment/Recycling from DeMenno/Kerdoon <br /> 10) What happens to the petroleum contact water once off site? It is treated and recycled: attached Certificate of <br /> Treatment/Recycling' issued by DK. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.