Laserfiche WebLink
15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 <br /> DOOR SCHEDULE % KEYNOTES <br /> DOORS DOORS FRAMES DETAILS SIGNAGE <br /> 09.04B 06.30A PLASTIC LAMINATE CASEWORK(WITH WI DESIGN SERIES INDICATED)-SEE DETAILS <br /> '2z <br /> 10,11,12,13/AD.1 <br /> A MARK WIDTH HEIGHT TYPE THICKNESS MATERIAL HDW. GRP. MATERIAL TYPE GLAZING HEAD /JAMB THRESHOLD TEXT DETAIL COMMENTS <br /> 06.32B SOLID SURFACING COUNTERTOP M 4"BACKSPLASH SEE DETAIL SHEET 15,16/AD.1 A <br /> > <br /> 6'-8" A 1-3/4" WOOD 1 H.M. 1 5/AD.2 14/AD.2 RESTROOM 7A7E/AD.1 C14 CN 08.01 DOOR AND FRAME-SEE DOOR SCHEDULE <br /> 100 3 -0 , -9, 11 -� 1- � 08.15 COILING COUNTER DOOR <br /> 101 T-0" 6'-8" A 1-3/4" WOOD 2 H.M. 1 2/AD.2 ■06.30A 08.15A COILING COUNTER DOOR-OPERATOR SWITCH <br /> 102 3- 0" 6'-8" A 1-3/4" WOOD 3 H.M. 1 4/AD.2 12B/AD.2 <br /> =:_Z 09.04B GYPSUM BOARD-SEE FINISH SCHEDULE <br /> 103 3- 0" 6'-8" A 1-3/4" WOOD 4 H.M. 1 3/AD.2 <br /> 09.27B WALL BASE 4"COVED EPDXY WALL BASE-SEE DETAILS 10,11/AD.2 <br /> 104 8- 3" 4'-2" C ALUMINUM 6 - 6,7/AD.2 <br /> ZY) 09.27C WALL BASE-AT CABINET TOEKICK-TO MATCH ADJACENT WALL BASE <br /> 105 3- 0" 6'-8" B 1-3/4" WOOD 5 H.M. 1 GL-1 4/AD.2 12A/AD.2 C.0 f co <br /> 10.20 RESTROOM ACCESSORY PAPER TOWEL DISPENSER <br /> 106 T-0" 6'-8" B 1-3/4" WOOD 5 H.M. 1 GL-1 4/AD.2 12A/AD.2 44.,A09.27C 10.24 RESTROOM ACCESSORY SOAP DISPENSER a rch itects <br /> 107 8--3" 4'-2" C ALUMINUM 6 - 6,7/AD.2 10.34 WALL SURFACE PROTECTION SYSTEM-CORNER GUARD-SEE DETAIL 16/AD.2 <br /> B 108 6'-0" 4'-2" C ALUMINUM 6 6,8/AD.2 22.04E PLUMBING FIXTURE-HAND SINK-SEE FOOD SERVICE AND PLUMBING DRAWINGS B TIMOTHY P. HUFF & <br /> 109 5--0" 4'-2" C ALUMINUM 6 6,8/AD.2 40" 19" EQ. EQ. 122.05 PLUMBING FIXTURE-SINK-SEE PLUMBING DRAWINGS ASSOCIATES, INC. <br /> C�:) 4=2 3 Timothy P. Huff, AIA Architect <br /> 24"DP 24"DPO424 424 O 519 McHenry Ave., Modesto, CA 95354 <br /> 24"DP 24"DP Ph: (209)571-2232 Fax: (209) 571-1936 <br /> LOCKABLE LOCKABLE AR <br /> PAQ4 <br /> cl� <br /> SAFETY GLAZING 4 No. C <br /> 15527 <br /> C GL-1 C <br /> _7 REN. 5/2 <br /> T <br /> C AA- <br /> > <br /> 06.30A - 04 <br /> _71 Copyright 2021 -Timothy P. Huff&Associates <br /> OPEN TO <br /> HALL 128 <br /> ---------- 10.34 <br /> - <br /> CD <br /> TYPE A TYPE B TYPE C TYPE 1 <br /> D D <br /> SOLID CORE WOOD SOLID CORE WOOD <br /> 19" 40" <br /> 423 C�D <br /> NOTES: 24"DP 24"DP O O <br /> 1. "T"INDICATES SAFETY GLAZING LOCATION-PER CBC 2406.4 LOCKABLE <br /> 2. DOOR HANDLES, PULLS, LATCHES,LOCKS,OPERABLE PARTS AND OTHER SUCH HARDWARE <br /> SHALL BE LOCATED 34"MIN.AND 44"MAX.ABOVE THE FINISH FLOOR-PER CBC 11 B-404.2.7 <br /> ------------ <br /> E E <br /> 3. OPERABLE PARTS SHALL BE OPERABLE WITH ONE HAND AND SHALL NOR REQUIRE TIGHT <br /> GRASPING, PINCHING OR TWISTING OF THE WRIST-PER CBC 11B-309.4 <br /> 4. THE FORCE OF OPENING DOORS SHALL BE 5#MAX-PER CBC 1113-404.2.9 <br /> &0 <br /> F IF <br /> EQ EQ Consultants <br /> DOOR SCHEDULE C4N) C�:) <br /> 24"DP 24"DP <br /> LOCKABLE <br /> FINISH SCHEDULE <br /> G ROOM ROOM WALL CEILING G <br /> NUMBER NAME FLOOR BASE NORTH EAST SOUTH WEST CEILING HEIGHT COMMENTS LU CV <br /> LU LU <br /> LU <br /> 114 MULTI-PURPOSE F-1 BASE NOTE#2 W-1,W-2 CEILING NOTE#1 14'-0" <br /> ROOM <br /> 10, <br /> 119 RESTROOM F-3 B-2 W-4 W-4 W4 W-4 C-2 -01, LU Z <br /> % '42" <br /> 10, <br /> 120 CUSTODIAL F-4 B-3 W-3 W-3 W-3 W-3 C-1,C-2 <br /> 'T, <br /> ,( ­i� � 1 `1'••' ' "' _31 Uj a. qqe <br /> 10, Y <br /> 121 ELECTRICAL F-6 <br /> 9. <br /> 122 VESTIBULE F-5 BASE NOTE#3 W-1 <br /> C0 <br /> 10, 06.30A <br /> H 123 KITCHEN F-2 B-1 W-3 W-3 W-3 W-3,W-5 C-1,C-2 -01, H 00 <br /> U) LU <br /> 124 DRY STORAGE F-2 B-1 W-3 W-3 W-3 W-3 C-2 101-01, <br /> OPEN TO OPEN TO <br /> 10. <br /> 125 WALK-IN COOLER F-7 W-2 W-2 W-2 W-2 C-2 -01. HALL 128 KITCHEN <br /> 22.05 <br /> /FREEZER 27 123 Z 0 <br /> 10.24 <br /> CD <br /> ce) <br /> 10, <br /> -2 -1 -3 -3 -3 -3 -1 101-01, <br /> 126 STORAGE F B W W W W C <br /> 20 <br /> 127 STORAGE F-2 B-1 W-2 W-2 W-2 W-2 C-1 -01, CN <br /> Uj <br /> L <br /> 101-01, <br /> 128 HALL F-2 B-1 W-3 W-3 W-3 W-3 C-1,C-2 TYP. <br /> 129 SERVING F-2 B-1 W-2 W-2 W-2 W-2 C-2 101-01, Uj <br /> Cl) <br /> Cn <br /> FLOORING BASE WALLS CEILING (.5 Z <br /> LU LLJ 0 <br /> 40" 42" 42" 1-- <br /> F-1: (E)POLISHED CONCRETE B-1: COVED EPDXY-SEE DETAILS 10,1 VAD.2 W-1: (E)GYPSUM BOARD-RETEXTURE AND REPAINT C-1: (E)GYPSUM BOARD-REPAINT < <br /> F-2: EPDXY 0/(E)QUARRY TILE B-2: COVED CERAMIC TILE-SEE DETAIL 13/AD.2 W-2: GYPSUM BOARD W/PAINT FINISH C-2: GYPSUM BOARD W/PAINT FINISH C12) 142 C12:) 2i < <br /> F-3: CERAMIC TILE-SEE FLOOR B-3: 4"RUBBER BASE W-3: FRP OVER GYPSUM BOARD-SEE DETAIL 15/AD.2 27DP 27DP 27DP LLi > <br /> TILE PATTERN LAYOUT W-4: CERAMIC TILE TO+84"-GYPSUM BOARD W/PAINT FINISH ABOVE 1. PATCH AND PAINT WEST SOFFIT AREA LOCKABLE LOCKABLE 3 z LL, <br /> LLJ < _j <br /> F-4: (E)VCT 1. THE CONTRACTOR IS TO VERIFY THE(E)RUBBER BASE SEE WALL TILE PATTERN LAYOUT I_ _j Uj <br /> F-5: (E)CARPET COLOR AND PROFILE AND NEW BASE IS TO MATCH(E) W-5: STAINLESS STEEL WALL PANEL-SEE KITCHEN DRAWINGS Z <br /> F-6: EXPOSED CONCRETE 2. REMOVE AND REPLACE 6"RUBBER WALL BASE ALONG THE <br /> F-7: SEALED CONCRETE WEST WALL- MATCH EXISITNG 1. AT EXISTING WALL GYPSUM BOARD PATCH,OR NEW TO EXISTING 0 <br /> 3. REMOVE AND REPLACE 6"RUBBER WALL BASE ALONG THE WALL INTERSECTION LOCATIONS,THE CONTRACTOR IS TO U_ LU <br /> NORTH WALL-MATCH EXISITNG RETEXTURE AND REPAINT THE ENTIRE WALL LENGTH-INSIDE TO 0 <br /> INSIDE CORNER OR OUTSIDE TO OUTSIDE CORNER LU <br /> Z <br /> N <br /> 09.046 <br /> i> <br /> 10.20 <br /> 08 <br /> 4E <br /> 0 <br /> r <br /> CT-3 08.15A <br /> C: <br /> 10.24 <br /> C) RESTROOM <br /> 06.326 <br /> 0 <br /> CT-2 <br /> ■ <br /> 'E 119 CO 08.01 <br /> K C� (.0 <br /> K <br /> 0 Or <br /> CT-1 <br /> CU > <br /> NOTE: <br /> ■> TYP. REFER TO FOOD SERVICE DRAWINGS FOR ADDITIONAL KITCHEN EQUIPMENT, <br /> /EQ EQ EQ L EQ 36" 34" STAINLESS STEEL AND SHELVING INFORMATION(INCLUDING WALL BACKING) <br /> 2 A CB-1 of <br /> 4-- �211 ��21�1 GK) C�) Project Number 2008 <br /> 0 06.30PROVIDE CORNER GUARDS AT ALL OUTSIDE WALL CORNERS AT ROOMS 120, 123, <br /> >% PT-2 PT-1 23"DP 23"DP 23"DP 23"DP 23"DP 24"DP 127, 128 AND 129-SEE DETAIL 16/AD.2 <br /> LOCKABLE LOCKABLE Date AUGUST 2020 <br /> SEE DETAIL 5/AD.1 FOR RESTROOM FIXTURE AND ACCESSORY MOUNTING <br /> 00 Drawn by Author <br /> C) HEIGHTS <br /> C) WALL TILE PATTERN FLOOR TILE PATTERN <br /> (14 Checked by Checker <br /> ILI <br /> O'-DR <br /> 0 <br /> A2 . 1 <br /> _j INTERIOR ELEVATIONS <br /> FINISH SCHEDULE NOTES <br /> SCALE: 1/4" V-0" Plot Date &Time 3/3/2021 8:23:30 AIVII <br /> 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 <br />