ABBREVIATIONS MECHANICAL SYMBOL LEGEND SYSTEM COMMISSIONING SYSTEM COMMISSIONING (continued) GENERAL MECHANICAL NOTES
<br /> AFF ABOVE FINISHED FLOOR CONTRACTOR RESPONSIBILITIES FOR BUILDING COMMISSIONING M� CONTRACTOR SHALL PROVIDE A TRAINING PLAN FOR EACH 1 MECHANICAL CONTRACTOR SHALL COORDINATE WITH THE
<br /> AHJ AUTHORITIES HAVING JURISDICTION TRADE(MECHANICAL, ELECTRICAL, PLUMBING, RENEWABLE GENERAL CONTRACTOR TO PATCH AND REPAIR ALL EXISTING
<br /> APPROX APPROXIMATE r�71 TYPICAL SUPPLY DUCT UP/DN DUCT HEATER CONTRACTOR SHALL PROVIDE SUPPORT AND WORK AS SPECIFIED, SYSTEMS)FOR THE CXA'S APPROVAL. THE TRAINING PLAN SHALL WALLS, FLOORS, CEILINGS OR OTHER SURFACES IDENTIFIED TO
<br /> NEEDED AND REQUIRED TO CONDUCT AND FACILITATE STARBUCKS OUTLINE ALL THE TOPICS THAT ARE TO BE COVERED ALONG WITH REMAIN THAT MAY BECOME DAMAGED DURING THE COURSE OF
<br /> BLDG BUILDING TYPICAL RETURN OR MANUALVOLUME STAFF BUILDING COMMISSIONING EFFORTS, THIS WORK WILL BE THE TIME DURATION FOR EACH TOPIC. IT SHALL ALSO INCLUDE WORK.
<br /> z EXHAUST DUCT DAMPER COMPRISED OF THREE DISTINCT EFFORTS: THE INSTRUCTOR'S NAME, QUALIFICATIONS AND COMPANY LOGO.
<br /> CO2 CARBON DIOXIDE UPION 1. SUPPORT STARBUCKS COMMISSIONING AGENT(CXA)DURING 2. DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL INTENT
<br /> CD CEILING DIFFUSER BACK DRAFT DAMPER INSTALLATION VERIFICATION AND CORRECT DISCLOSED N. THE CONTRACTOR IS RESPONSIBLE FOR RECORDING OR ARRANGEMENT OF SYSTEM(S). FURNISH & INSTALL ALL
<br /> CLG CEILING TURNING VANES DEFICIENCIES. ATTENDANCE FOR EACH TRAINING SESSION. COPIES OF THESE COMPONENTS NEEDED WHETHER INDICATED OR NOT TO PROVIDE
<br /> CONST CONSTRUCTION SMOKE DETECTOR 2. PERFORM TESTING,ADJUSTING, BALANCING AND SYSTEM SHALL BE SUBMITTED TO THE CXA. A COMPLETE AND OPERATING SYSTEM. 2020 STARBUCKS COFFEE COMPANY
<br /> CXA COMMISSIONING AGENT U) STARTUP AND SUPPORT FUNCTIONAL PERFORMANCE TESTING
<br /> EQUIPMENT DESIGNATION BY STARBUCKS CXA; 0, CONTRACTOR SHALL SUBMIT O&M MANUALS FOR ALL PIECES OF 1 CONTRACTOR TO VERIFY ALL DIMENSIONS, INCLUDING
<br /> DEG DEGREES <�>---j COMBINATION 1 CORRECT DEFICIENCIES DISCLOSED BY FUNCTIONAL EQUIPMENT AT LEAST 6 WEEKS IN ADVANCE OF THE TRAINING CLEARANCES REQUIRED BY OTHER TRADES,AND NOTIFY S I ARBUCKS
<br /> DM STARBUCKS DESIGN MANAGER THERMOSTAT SMOKE AND FIRE PERFORMANCE TESTING AND SUBMIT REPORTS. SESSIONS, STARBUCKS CONSTRUCTION MANAGER OF ANY DISCREPANCIES 2401 UTAH AVENUE SOUTH
<br /> DN DOWN DAMPER PRIOR TO PROCEEDING WITH THE WORK. ALL DIMENSIONS ARE TO
<br /> DTL DETAIL SPIN-�N TAKE-OFF CONTRACTOR SHALL PERFORM AND PROVIDE THE FOLLOWING� THE FACE OF THE FINISHED SURFACE UNLESS NOTED OTHERWISE. SEATTLE, WASHINGTON 98134
<br /> DWG(S) DRAWING(S) THERMOSTAT SENSOR AND VOLUME HVAC EQUIPMENT AND MATERIALS ALL DIMENSIONS TO BE TAKEN FROM ACTUAL BUILDING (206) 318-1575
<br /> DAMPER A. SYSTEMS SUBJECT TO COMMISSIONING MAY INCLUDE , BUT ARE DIMENSIONS.
<br /> EA EACH NOT LIMITED TO DOMESTIC HOT WATER GENERATION, RVAC THESE DRAWINGS AND THE PROJECT MANUAL
<br /> EC ELECTRICAL CONTRACTOR SUPPLY AIR ARROW UNDERCUT DOOR SYSTEMS, ROOFTOP UNITS, EXHAUST FANS, HVAC CONTROLS, FILTERS 4� THE MECHANICAL CONTRACTOR SHALL COORDINATE HVAC WORK ARE CONFIDENTIAL AND SHALL REMAIN THE
<br /> ECP EQUIPMENT CONTROL PAC LIGHTING CONTROLS, AIR CURTAINS, BUILT-IN REFRIGERATION, TIF—OPERATING HVAC DURING CONSTRUCTION, PROVIDE THREE(3)SETS WITH OTHER TRADES, THE ARCHITECTURAL DRAWINGS AND SOLE PROPERTY OF STARBUCKS
<br /> EG EXHAUST GRILLE RETURN AIR ARROW CONNECT TO EXISTING EQUIPMENT AND RENEWABLE ENERGY SYSTEMS, OF 2"(51 MM) MERV6 PLEATED DISPOSABLE FILTERS(OR HIGHER RATING PROJECT MANUAL SHALL TAKE PRECEDENCE OVER ALL OTHER CORPORATION,WHICH IS THE OWNER OF THE
<br /> ELEC ELECTRICAL IF REQUIRED BY LEED). USE ONE SET UNTIL COMPLETION OF DRAWINGS. SEE ARCHITECTURAL DRAWINGS AND PROJECT COPYRIGHT IN THIS WORK. THEY SHALL NOT BE
<br /> EM EMERGENCY B, CONTRACTOR SHALL PROVIDE WRITTEN RESPONSES TO ALL CONSTRUCTION, INSTALL ONE SET AT COMPLETION OF CONSTRUCTION MANUAL FOR DIMENSIONED DIFFUSER LOCATIONS AND MOUNTING REPRODUCED(IN WHOLE OR IN PART), SHARED
<br /> EMS ENERGY MANAGEMENT SYSTEM INDICATES UNLINED 12"X 8"O.D.SHEETMETAL CXA'S REVIEWS AND COMMENTS. RESPONSES SHALL BE (PRIOR TO TAB)AND DELIVER ONE SET OF MERV13 FILTERS TO HEIGHTS WHERE EXPOSED. WITH THIRD PARTIES OR USED IN ANY MANNER
<br /> EXIST EXISTING 12X8 1ST FIGURE SIDE SHOWN PROVIDED IN A TIMELY MANNER. STARBUCKS LABELED TO DENOTE THEIR RESPECTIVE ON OTHER PROJECTS OR EXTENSIONS TO THIS
<br /> EXT EXTERIOR 2ND FIGURE SIDE NOT SHOWN AIR HANDLING UNIT. 5. NEW DUCTWORK AND EQUIPMENT SHALL NOT BE INSTALLED PROJECT WITHOUT THE PRIOR WRITTEN
<br /> C� CONTRACTOR SHALL INCLUDE COMMISSIONING ACTIVITIES IN WHERE IT OBSTRUCTS ANY EXISTING OR NEW AREAS THAT CONSENT OF STARBUCKS CORPORATION.
<br /> F&I FURNISH & INSTALL 12X8 INDICATED 14"X 10" (355mm X 255mm)O.D. PROJECT SCHEDULE AND SHOW INTERVALS FOR PERFORMANCE BRACING AND ANCHORING REQUIRE ACCESS, THESE DRAWINGS AND SPECIFICATIONS ARE
<br /> FOK� FURNISHED BY OWNER, SHEETMETAL W/1"(25mm)SOUNDLINER OF WORK FOR WHICH CONTRACTOR IS RESPONSIBLE AND ALL MECHANICAL EQUIPMENT, FIXED OR FLEXIBLY MOUNTED,SHALL BE INTENDED TO EXPRESS DESIGN INTENT FOR A
<br /> INSTALLED BY CONTRACTOR (LLN,O), 12"X 8"(305mm X 205mm LID,NET INTERVALS FOR WORK PERFORMED BY STAIRSUCKS CXA. BRACED OR ANCHORED TO COMPLY WITH LOCAL CODES. & INSULATE DUCTWORK PER CODE AND SPEC, REQUIREMENTS, PROTOTYPICAL STARBUCKS STORE(WHICH IS
<br /> FOIO FURNISHED BY OWNER, CONTRACTOR SHALL SHOW RESOURCES FOR PERFORMING ALL COORDINATE CLEARANCE REQUIREMENTS FOR ADDED SUBJECT TO CHANGE AT ANYTIME)AND DO NOT
<br /> INSTALLED BY OWNER FLEXIBLE DUCT CONNECTION WORK RELATED TO COMMISSIONING ACTIVITIES ON A LINE ITEM INSULATION. REFLECT ACTUAL SITE CONDITIONS. NEITHER
<br /> FLR FLOOR IN THE SCHEDULE OF VALUES. DUCTWORK AND ACCESSORIES PARTY SHALL HAVE ANY OBLIGATION NOR
<br /> FT FOOT/FEET 7. ALL IS NEW UNLESS NOTED OTHERWISE. LIABILITY TO THE OTHER(EXCEPT STATED
<br /> FLEXIBLE DUCT D� CONTRACTOR SHALL INSTALL EQUIPMENT IN ACCORDANCE WITH ABOVE) UNTIL A WRITTEN AGREEMENT IS FULLY
<br /> G GAS PIPING THE MANUFACTURER'S REQUIREMENTS AND ALL CONTRACT SHEET METAL DUCTWORK EXECUTED BY BOTH PARTIES.
<br /> GO GENERAL CONTRACTOR DOCUMENTS. ENSURE THAT ALL EQUIPMENT IS INSTALLED ASSEMBLE AND INSTALL DUCTWORK IN ACCORDANCE WITH RECOGNIZED GENERALNOTES STARBUCKS TEMPLATE VERSION: i2020-01-31.1
<br /> TOTALLY COMPLETE AND ACCESSIBLE TO STARBUCKS CXA FOR INDUSTRY PRACTICE FOR ACHIEVING AIR TIGHT(5%LEAKAGE)AND
<br /> HR HOUR 12,10 NECK SIZE INSTALLATION VERIFICATION AND FUNCTIONAL PERFORMANCE NOISELESS(NO OBJECTIONABLE NOISE)SYSTEMS, NO VARIATION OF
<br /> HVAG HEATING,VENTILATION,AIR CONDITIONING CD-11 400 —DESIGN CFM(WHERE APPLICABLE) TESTING PRIOR TO THE SCHEDULED START OF INSTALLATION DUCT CONFIGURATION OR SIZES WILL BE PERMITTED EXCEPT BY SCOPE ARCHITECT OF RECORD
<br /> VERIFICATION, PERMISSION FROM THE ENGINEER. T—H—E-TN—TENT OF THE PROJECT MANUAL AND THE DRAWINGS IS TO IC ID 'S t 2
<br /> LD. INSIDE DIAMETER DIFFUSER TYPE(REFER SCHEDULE) mn -S5 2
<br /> PROVIDE A COMPLETE AND FULLY OPERATIONAL MECHANICAL SYSTEM,
<br /> IAQ INDOOR AIR QUALITY E. CONTRACTOR SHALL COMPLETE MANUFACTURER'S STARTUP DAMPERS THE MECHANICAL CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, LZ CD
<br /> PROCEDURES PRIOR TO COMMISSIONING COORDINATION WITH U_
<br /> AND EQUIPMENT NECESSARY TO COMPLETE THE MECHANICAL WORK,
<br /> PROVIDE CONVENIENTLY LOCATED ACCESS DOORS OF AMPLE SIZE AND cc
<br /> LCP LIGHTING CONTROL PANEL CEILING DIFFUSER(FLOW ARROWS CXA� QUANTITY FOR SERVICING THE DAMPERS. PROVIDE MOTORIZED DAMPERS Cn
<br /> LL LANDLORD AT ALL INTAKE&EXHAUST BUILDING OPENINGS. COORDINATE WITH SITE EXAMINATION
<br /> LV LOW VOLTAGE SHOWN ONLY IF AIR FLOW NOT F. CONTRACTOR SHALL BE READILY AVAILABLE DURING OTHER TRADES FOR ACCESS PANELS, POWER AND FIRE ALARM THE MECHANICAL CONTRACTOR SHALL THOROUGHLY EXAMINE ALL
<br /> SYMMETRICAL) INSTALLATION VERIFICATION TO CORRECT ANY DEFICIENCIES OR INTERFACES. SEE PROJECT MANUAL. AREAS WHERE EQUIPMENT, DUCTWORK,AND PIPING WILL BE INSTALLED
<br /> MAX MAXIMUM DEFECTS IS CLOSED BY THE INSTALI...AT�ON VERIFICATION m c g a r c h i t e c u r e
<br /> MC MECHANICAL CONTRACTOR CEILING RETURN/EXHAUST GRILLE PROCESS. CORRECTIONS SHALL BE MADE IN A TIMELY MANNER AND WILL REPORT ANY CONDITION THAT, IN HIS OPINION, PREVENTS THE 15635 Alton Parkway,Suite 100, Irvine,CA 92618
<br /> MECH MECHANICAL WITHOUT DISRUPTION OF THE CONSTRUCTION SCHEDULE, ACOUSTICAL DUCT LINER PROPER INSTALLATION OF THE MECHANICAL WORK. P:949.553.1117 F:949.474.7056
<br /> MEP MECHANICAL, ELECTRICAL AND PLUMBING UNLESS OTHERWISE INDICATED ON THE PLANS, PROVIDE V(25MM) PENETRATIONS ARCHITECT STAMP -
<br /> MFG MANUFACTURER G. ALL HVAC EXHAUST FAN AND AIR CURTAIN EQUIPMENT SHALL BE ACOUSTICAL DUCT LINER IN SUPPLY AND RETURN DUCTWORK WITHIN 10'-
<br /> MIN MINIMUM TESTED,ADJUSTED AND BALANCED BY THE CONTRACTOR�S 0"(305CM)OF THE DISCHARGE AND INTAKE OF AIR HANDLING UNITS. WHERE PIPES AND DUCTS PENETRATE WALL, SEAL OPENINGS TO
<br /> CONTROLS AND OPERATION NOTES TESTING,ADJUSTING AND BALANCE AGENT(SEE TESTING INCREASE DUCT SIZE INDICATED ON PLANS AS NEEDED TO PREVENT AIR TRANSFER BETWEEN SPACES. USE FIRE RATED SEALANTS
<br /> NTS NOT TO SCALE ADJUSTING AND BALANCING)AFTER THE SYSTEM IS VERIFIED TO ACCOMMODATE LINER. LINER TO BE PROVIDED AND FASTENED TO DUCT ON ALL FIRE SEPARATION PENETRATIONS, INCLUDING FLOORS, SEAL
<br /> THE GENERAL CONTRACTOR SHALL FURNISH AND INSTAL— — — — — - BE COMPLETE AND CORRECT BY STARBUCKS CXA, IN WITH MECHANICAL LINER FASTENERS IN ACCORDANCE WITH SMACNA AND AROUND ALL PIPES AND DUCTS PENETRATING FIRE SEPARATIONS WITH
<br /> O�D� OUTSIDE DIMENSION FOLLOWING COMPONENT& LTHE ACCORDANCE WITH THE REQUIREMENTS OF THESE PROJECT MANUAL. NON-COMBUSTIBLE PACKING RETAINED BY METAL COLLARS. THE
<br /> OSA OUTSIDE AIR DOCUMENTS, ALL HVAC CONTROL SYSTEMS SHALL BE TESTED FLEXIBLE DUCTWORK ASSEMBLY SHALL BE APPROVED BY STATE FIRE MARSHALL.
<br /> CONTROL WIRING TO ENSURE THAT CONTROL DEVICES, COMPONENTS, EQUIPMENT FLEXIBLE DUCT WORK SHALL ONLY BE INSTALLED AS SHOWN IN PLAN AND STANDARDS
<br /> REF REFERENCE THE MECHANICAL CONTRACTOR SHALL PROVIDE ALL CONTROL AND SYSTEMS ARE CALIBRATED,ADJUSTED AND OPERATE IN NOT ABOVE HARD LID CEILINGS, FLEXIBLE DUCTWORK SHALL NOT EXCEED EQUIPMENT AND MATERIALS SHALL CONFORM WITH THE APPROPRIATE
<br /> REQ'D REQUIRED WIRING IN CONDUIT NECESSARY FOR THE COMPLETE AND PROPER ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS. 5-0"(152CM) IN LENGTH AND TWO 45' ELBOWS. IT SHALL BE PULLED TAUT PROVISIONS OF CSA, ULC,ARL, ASME, ASTM, UL, NEMA,ANSI,SMACNA, 11-19-21
<br /> REV REVISION OPERATING TEMPERATURE CONTROL SYSTEM INCLUDING ALL MODES SEQUENCES OF OPERATION SHALL BE TESTED TO ENSURE THAT AND APPROPRIATELY FASTENED TO RIGID BRANCH DUCT&DIFFUSER. ASHRAE, NFPA,AS APPLICABLE TO EACH INDIVIDUAL UNIT OR ASSEMBLY.
<br /> RT ROOFTOP OF OPERATION AND INTERLOCK, THEY OPERATE IN ACCORDANCE WITH THE CONTRACT BENDS SHALL BE MINIMIZED AND WHERE NEEDED BE A FULL RADIUS BEND.
<br /> REQUIREMENTS. DELIVERABLE& PRELIMINARY,WRITTEN SUPPORT BANDS SHALL BE INSTALLED SO AS TO NOT CRIMP FLEX DUCT. CODES
<br /> SF SQUARE FEET EXHAUSTFANS TESTING AND AIR BALANCE REPORT CONFORMING TO THE FLEXIBLE DUCTWORK SHALL MEET REQUIREMENTS. A_LLWORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH ALL
<br /> BHT SHEET RESTROOM EXHAUST FAN(S)TO BE OPERATED IN CONJUNCTION WITH REQUIREMENTS SPECIFIED HEREIN, DOCUMENTING THE APPLICABLE PROVINCIAL AND LOCAL CODES AND ORDINANCES. IN CASE
<br /> SPECS SPECIFICATION(S) STORE HOURS UNLESS OTHERWISE NOTED OR APPROVED OR AS INFORMATION SPECIFIED, ETC_TO THE STARBUCKS CXA OF CONFLICT BETWEEN THE DRAWINGS AND PROJECT MANUAL AND THE
<br /> SST STAINLESS STEEL REQUIRED BY JURISDICTION (COORDINATE WITH ELECTRICAL), IMMEDIATELY UPON COMPLETION OF THE WORK, CODES AND ORDINANCES, USE WHICHEVER IS MORE STRINGENT, THE
<br /> H� PROVIDE A LIST OF ALL FACTORY AND FIELD SETTINGS THAT TESTING, ADJUSTING, BALANCING MECHANICAL CONTRACTOR SHALL SATISFY CODE REQUIREMENTS AS A
<br /> TEMP TEMPORARY THERMOSTAT MINIMUM STANDARD WITHOUT ANY EXTRA COST TO STARSUCKS,
<br /> TYP TYPICAL HAVE BEEN PROGRAMMED INTO THE EQUIPMENT(SUCH AS
<br /> PERMANENT THERMOSTAT(S)AND REMOTE SENSOR(S)SHALL BE SETPOINTS, SCHEDULES, DIP SWITCH SETTINGS, CONDENSER INDEPENDENT AIR BALANCE CONTRACTOR OR QUALIFIED MECHANICAL
<br /> UNO UNLESS NOTED OTHERWISE FURNISHED AND INSTALLED. ONE THERMOSTAT AND SENSOR IS AND EVAPORATOR OPERATING PRESSURETTEMPERATURE, CONTRACTOR SHALL BE QUALIFIED BY NESS OR AABC STANDARDS. PERMITS AND FEES
<br /> LIC UNDER COUNTER PROVIDED FOR EACH UNIT. MOUNT THERMOSTAT(S)AND SENSOR(S) ETC.,.), BALANCER SHALL ACCURATELY BALANCE THE SUPPLY, RETURN AND THE MECHANICAL CONTRACTOR SHALL PROCURE AND PAY FOR ALL
<br /> IN LOCATION & HEIGHT AS INDICATED ON DRAWINGS. MECHANICAL OUTSIDE AIR, EXHAUST FAN(S), HYDRONK�(WHERE APPLICABLE)AND PERMITS, FEES,AND INSPECTIONS NECESSARY TO COMPLETE THE 4_0
<br /> WH WATER HEATER CONTRACTOR TO PROVIDE THERMOSTAT IDENTIFICATION LABELS PER L CONTRACTOR SHALL INFORM STARBUCKS CXA WHEN EXHAUST FAN(S)SYSTEMS TO PROVIDE AIR AND WATER QUANTITIES WITHIN MECHANICAL WORK,
<br /> SPECIFICATION REQUIREMENTS. REFER TO THERMOSTAT SETUP EQUIPMENT IS READY FOR FUNCTIONAL PERFORMANCE TESTING. 10% PLUS MINUS OF THE VALUES INDICATED ON THE DRAWINGS AND IN THE 0
<br /> WSHP WATER SOURCE HEAT PUMP INSTRUCTIONS BELOW FOR ADDITIONAL REQUIREMENTS. ALL EQUIPMENT SHALL BE READY FOR FUNCTIONAL SPECIFICATIONS UNLESS MANUFACTURER REQUIRES TIGHTER WARRANTY
<br /> THERMOSTAT SETUP INSTRUCTIONS PERFORMANCE TESTING PRIOR TO STARTING TESTING. THIS TOLERANCES. OPERATE AUTOMATIC CONTROLS SYSTEMS AND VERIFY THE MECHANICAL CONTRACTOR SHALL UNCONDITIONALLY WARRANT 3: 0
<br /> INCLUDES REHEARSING ALL FUNCTIONAL PERFORMANCE TESTS SETPOINTS FOR THERMOSTATS, CO2 SENSORS, DCV, EMS AND ALL WORK TO BE FREE OF DEFECTS IN MATERIAL AND WORKMANSHIP
<br /> PROVIDE THE FOLLOWING SETUP AND PROGRAMMING� BEFORE DEMONSTRATING TO THE CXA. CONTRACTOR SHALL ECONOMIZER/OUTSIDE AIR DAMPER. SEE CONTROLS AND OPERATION FOR A PERIOD OF ONE(1)YEAR FROM THE DATE OF FINAL ACCEPTANCE C:
<br /> 1. CONFIGURE AS FOLLOW& OPERATE EQUIPMENT FOR STARBUCKS CXA AND VERIFY BY NOTES AND HVAC SCHEDULES AND NOTES FOR DETAILS. IF DEFICIENCIES BY STARBUCKS AND WILL REPAIR OR REPLACE ANY DEFECTIVE WORK 04
<br /> A. DEGREES"F"DISPLAY DEMONSTRATING THE CORRECT OPERATION OF EQUIPMENT, OR SITE CONDITIONS PREVENT COMPLETE AND PROPER BALANCING, DO PROMPTLY AND WITHOUT CHARGE AND RESTORE ANY OTHER EXISTING E L0
<br /> B. 12 HOUR CLOCK SENSOR CALIBRATION, RESPONSE OF ACTUATORS AND PROPER NOT COMPLETE WORK AND SUBMIT A REQUEST FOR INFORMATION TO GET WORK DAMAGED IN THE COURSE OF REPAIRING DEFECTIVE MATERIALS E
<br /> C. CONTINUOUS FAN OPERATION IN OCCUPIED AND WORKMANSHIP. co C/) CU
<br /> MODE EXECUTION OF HVAC CONTROL AND LIGHTING SEQUENCES, COMPLETE INFORMATION PRIOR TO COMPLETING WORK, SUBMIT THREE(3) W C'%
<br /> INCLUDING BUT NOT LIMITED TO AIR MOVEMENT,TEMPERATURE, COPIES OF THE BALANCE REPORT TO THE ENGINEER, CONSTRUCTION L�j C:
<br /> D, DISABLE KEYBOARD PROGRAMMING SOUND AND CONTROL RESPONSE. PROVIDE ANY SECURITY MANAGER AND COMMISSIONING AGENT FOR APPROVAL, THE BALANCE 0
<br /> 2� SET TIME AND DATE. ACCESS, HARDWARE, SOFTWARE OR OTHER SUPPORT AS REPORT SHALL INCLUDE NESS OR AABC CREDENTIALS, LANDLORD REQUIREMENTS 00 -
<br /> 1 SET TO DISPLAY CURRENT TEMPERATURE. NEEDED FOR THE STARBUCKS CXA TO EFFICIENTLY WITNESS EQUIPMENT/INSTRUMENT LIST WIT THE MOST RECENT CALIBRATION DATE z co C
<br /> 4. SET OCCUPIED START TIME AT 30 MIN. BEFORE OPENING. F_ 0
<br /> SET UNOCCUPIED START TIME AT 30 MIN.AFTER CLOSING. AND DOCUMENT ALL EQUIPMENT TESTING. STARBUCKS CXA WILL AND BALANCE REPORTS FOR ALL HVAC AND EXHAUST SYSTEMS. T&B C) 06 0 4-0
<br /> VERIFY HOURS WITH STORE MANAGER OR RECORD THE EQUIPMENT OPERATION AND RESPONSE TO REPORT SHOULD MATCH NEBB OR AABC STANDARD REPORTS INCLUDING PRIORTOBID. THE GENERAL CONTRACTOR SHALL COORDINATEWITH W W
<br /> TESTING SEQUENCES AND PREPARE A LIST OF ANY DEFICIENCIES UNIT TEST DATA WITH TEMPERATURES, PRESSURES AND STATIC PRESSURE LANDLORD I BUILDING OWNER FOR ANY CONSTRUCTION REQUIREMENTS. __3 __3
<br /> CONSTRUCTION MANAGER. PROFILES. INCLUDE A COPY OF THE BALANCE REPORT AS APPROVED BY IF LANDLORD I BUILDING OWNER DOES HAVE REQUIREMENTS, 0 U-) 0 0
<br /> 5� SET POINTS SHALL BE AS FOLLOWS OR AS APPROPRIATE DISCLOSED BY THE FUNCTIONAL PERFORMANCE TESTS FOR 13f I C:) 4-0
<br /> FOR CLIMATE� CORRECTION BY THE CONTRACTOR. EQUIPMENT INCLUDES, BUT THE ENGINEER WITH APPLICATION FOR FINAL CONTRACT PAYMENT, CONTRACTOR SHALL BECOME COMPLETELY FAMILIAR WITH U)
<br /> A� OCCUPIED(5- F DEADBAND)(3-C DEADBAND) IS NOT LIMITED TO, AIR HANDLING UNITS, ROOFTOP AND SPLIT REQUIREMENTS AND ADHERE TO THEM. WHERE LANDLORD/BUILDING
<br /> 1, HEATING: 70' F (21'C) TYPE, CONDENSING UNITS, EXHAUST FANS, LIGHTING CONTROLS, OWNER REQUIREMENTS ARE MORE STRINGENT THAN SHOWN IN THESE
<br /> 11. COOLING� 75* F (24*C) ETC,., DELIVERABLE& PROVIDE COMPLETE'D COPIES OF ALL 1AQ MANAGEMENT PLAN PLANS (IN THE OPINION OF THE ENGINEER). LANDLORD I BUILDING OWNER STORE #: 20685
<br /> B. UNOCCUPIED START UP REPORTS, FILLED OUT ON THE MANUFACTURER'S REQUIREMENTS SHALL GOVERN, PROJECT #: 59335-039
<br /> 1. HEATING: 60' F (15'C) FORMS,TO THE STARBUCKS CXA. DURING CONSTRUCTION, CONTRACTOR SHALL COMPLY WITH CHAPTER 3 ISSUE DATE: CHECKSET
<br /> 11. COOLING� 78' F (25'C) J. CONTRACTOR IS RESPONSIBLE FOR CORRECTING ANY ISSUES OF SMACNA'S IAQ GUIDELINES FOR OCCUPIED BUILDINGS UNDER
<br /> & SET TWO(2) HOUR OCCUPIED OVERRIDE FUNCTION TO OR DEFICIENCIES DISCLOSED DURING THE FUNCTIONAL CONSTRUCTION. CONTRACTOR SHALL PERFORM AND SUBMIT ALL DESIGN MANAGER: J.RAMOS
<br /> PROVIDE THE FOLLOWING SET POINT OVERRIDES: PERFORMANCE TESTING PROCESS. CORRECTIONS SHOULD BE INFORMATION AS REQUIRED. IF HVAC SYSTEM IS TO BE USED DURING PRODUCTION DESIGNER:
<br /> A. HEATING: +2" F (1'�C) MADE IN A TIMELY MANNER WITHOUT DISRUPTION TO THE CONSTRUCTION, INSTALL MERV 8 FILTERS AT EACH RETURN AIR GRILL CHECKED BY: GRS
<br /> B COOLING� -2" F (1'C) SYSTEM AND CONSTRUCTION SCHEDULE. AND COMPLY WITH SMAGNA'S GUIDELINES, MCG PROJECT#: 21324
<br /> DEMAND CONTROL VENTILATION(DC K, CONTRACTOR SHALL BE READILY AVAILABLE FOR ANY BE- MCG PROJ. MANAGER: J.SPENCER
<br /> THE CO2 SENSOR SHALL MODULATE THE AIR HANDLING UNIT OUTSIDE TESTING OF EQUIPMENT DEEMED NECESSARY BY STARBUCKS MCG PROJ. SPECIALIST:
<br /> AIR DAMPER TO MAINTAIN 1000 PPM CO2 OR LESS CXA DURING INSTALLATION VERIFICATION AND FUNCTIONAL ENERGY MANAGEMENT SYSTEM (EMS)
<br /> OCCUPIED MODE: PERFORMANCE TESTING. CONTRACTOR IS RESPONSIBLE FOR — — — — — — — — — — — — — — — — — — — — -1 Revision Schedule
<br /> 1 FAN SHALL RUN CONTINUOUSLY WHILE BRINGING IN CORRECTING ANY ISSUES OR DEFICIENCIES FOUND IN THE THE GENERAL CONTRACTOR SHALL INSTALL(OR DEMO AND REINSTALL
<br /> MINIMUM DCV OUTSIDE AIR AS INDICATED IN SCHEDULE.
<br /> 2� IF CO2 SENSOR SET POINT IS BELOW THE SETPOINT,THE SYSTEM DURING ANY AND ALL RE-TEST�NG. CORRECTIONS FOR RENOVATIONS)THE VENSTAR SURVEYOR EMS SYSTEMS PRIOR TO Rev Date By Description
<br /> AIR DAMPER SHALL BE OPEN TO THE CALCULATED DCV SHOULD BE MADE IN A TIMELY MANNER WITHOUT DISRUPTION TO THE LAST WEEK OF CONSTRUCTION. GENERAL CONTRACTOR TO PROVIDE
<br /> MINIMUM OUTSIDE AIR. THE SYSTEM AND CONSTRUCTION SCHEDULE. DEUVERABLE& ONE PERMANENT THERMOSTAT AND REMOTE SENSOR PER HVAC UNIT.
<br /> 1 IF CO2 SENSOR SETPO�NT IS EXCEEDED, OUTSIDE AIR FINAL BALANCE REPORT, DEFICIENCIES LIST NOTING LOCATE AND MOUNT THERMOSTAT(S)AND SENSOR(S)PER THE
<br /> DAMPER SHALL MODULATE TO MAINTAIN 1000 PPM NOT To CORRECTIVE ACTIONS PERFORMED BY CONTRACTOR IN DRAWINGS. PROVIDE THERMOSTAT IDENTIFICATION LABELS PER
<br /> EXCEED THE CALCULATED DESIGN MINIMUM OUTSIDE AIR. RESPONSE TO INSTALLATION VERIFICATION AND FUNCTIONAL SPECIFICATION REQUIREMENTS.
<br /> 4� UPON CO2 PPM FALLING BELOW THE SETPOINT OF 1000 PERFORMANCE TEST RESULTS. GENERAL CONTRACTOR TO PROGRAM, START-UP AND COMMISSION THE
<br /> PPM, THE AIR DAMPER SHALL RETURN TO DCV MINIMUM L� CONSTRUCTION AND POST CONSTRUCTION TESTING: CONTROL SYSTEM. GENERAL CONTRACTOR IS TO COMPLETE FINAL SHEET TITLE:
<br /> OUTSIDE AIR. ADDITIONAL TESTING MAY BE REQUIRED BY LEED AND OTHER CONNECTION AFTER DATA RACK AND NETWORK INSTALLATIONS. GENERAL
<br /> 5� THE ECONOMIZER SHALL HAVE PRIORITY OVER THE DCV PROCESSES THAT MAY OCCUR OUT OF SEQUENCE WITH CONTRACTOR VENDOR TO VERIFY SYSTEM OPERATION AND MECHANICAL NOTES,
<br /> CONTROLS, OUTSIDE AIR MAY EXCEED DCV MINIMUM AND COMMISSIONING SERVICE. CONTRACTOR SHALL CONDUCT. TROUBLESHOOT IF REQUIRED. GENERAL CONTRACTOR TO COMPLETE
<br /> DESIGN MINIMUM WHEN AIR CONDITIONS ARE DOCUMENT, SUPPORT AND SCHEDULE THIS TESTING AS SURVEYOR'S STARBUCKS INSTALLATION SURVEY FORM AND PROVIDE Two DETAILS & LEGENDS
<br /> APPROPRIATE TO DO SO. DIRECTED BY STAIRSUCKS CXA, (2)COMPLETED COPIES OF THIS DOCUMENT TO THE CONSTRUCTION SCALE:AS SHOWN
<br /> UNOCCUPIED MODE: t4gA#, AGF=F4 4P49 4GF=N:�PR�GR:4:G F44-A�P44HF=H:��
<br /> 1� FAN SHALL CYCLE WITH HEATING AND OUTSIDE AIR
<br /> DAMPER CLOSED. OUTSIDE DAMPER SHALL NOT BE SHEET NUMBER:
<br /> CYCLED WITH CO2 PPM SETPOINT,
<br /> M-0003