Laserfiche WebLink
cn <br /> JIF_ <br /> Q <br /> W <br /> C1 PM4i <br /> W N <br /> C <br /> C/) O <br /> V <br /> co <br /> O <br /> O <br /> EQUIPMENT SCHEDULE ARCHITECT PBK•WLC,Inc. <br /> M-WO.com <br /> ITEM EQUIPMENT EQUIPMENT EQUIPMENT SACRAMENTO <br /> G 7 8 Y <br /> Q 2520 Venture Oaks Way,Suite 440 <br /> NO QTY STAT EQUIPMENT CATEGORY MANUFACTURER MODEL NUMBER REMARKS WT. LBS ANCHORAGE o <br /> Sacramento,CA 3 <br /> 916-682-9494 P <br /> ❑ 1 1 CFCI AIR CURTAIN, UNHEATED BERNER SLC07-1036A 45 DETAIL K/FS8.1 Z <br /> 2 1 CFCI SINK, HAND, WALL MOUNT EAGLE GROUP/METAL MASTERS HSAP-14-ADA-FW 55 DETAIL H/FS8.1 <br /> STO. LACTATION 3 1 OFCI CABINET, HOLDING/PROOFING METRO C519-FC 120v/1-16.7AMP 197 CASTERS <br /> TABLE STO. 106 <br /> E i 105 4 1 OFCI OVEN, RETHERM AND HOLD CRIES COR RO-151-FUA-18DE 208v/1 MOBILE <br /> TOILET <br /> r 107 5 1 CFCI WORK COUNTER CUSTOM FABRICATED ITEM 140 DETAIL J/FS8.1-C <br /> i•. �:' 6 1 CFCI WALL MOUNTED SHELF CUSTOM FABRICATED ITEM 40 DETAIL G/FS8.1 <br /> O <br /> 7 1 CFCI PREP SINK CUSTOM FABRICATED ITEM INCL. ITEM #5 <br /> 8 1 CFCI SINK SCULLERY 3 COMPARTMENTS EAGLE GROUP/METAL MASTERS FFN2754-3-24-14/3 197 DETAIL J/FS8.1-C <br /> 12 13 <br /> 9 1 OFCI REFRIGERATOR, REACH-IN CENTRAL 69K-032 120v/1 DETAIL J/FS8.1-C <br /> 10 1 CFCI SNEEZE GUARD PREMIER METAL & GLASS FM2N 175 <br /> JAN. <br /> 10911 1 CFCI SERVING COUNTER FABRICATED ITEM CUSTOM 200 DETAIL J/FS8.1-C <br /> STORAGE 12 1 CFCI CABINET FOR CLEANING SUPPLIES ADVANCE TABCO WCH-15-36 200 DETAIL 3/FS4.1 <br /> 108 13 1 CFCI WALL MOUNTED MOP RACK ADVANCE TABCO K-246 65 DETAIL G/FS8.1 <br /> 14 2 CFCI DRY STORAGE SHELVING METRO A1842NC 200 DETAIL D/FS8.2 <br /> 14.1 1 CFCI DRY STORAGE SHELVING METRO A2442NC 200 DETAIL D/FS8.2 <br /> 15 1 CFCI MILK COOLER BEVERAGE-AIR SM49N-W 339 CASTERS <br /> MULTIPURPOSE <br /> WEST <br /> 116 <br /> ----------------------------- ------------- --T <br /> COPY ROOM <br /> TABLE STO. 113 TABLE STO. <br /> 118 II 112 Q <br /> Z <br /> FLOOR LEGEND o <br /> J <br /> 10 SYMBOL DESCRIPTION U <br /> IT FLt OFCI OWNER FURNISH/CONTRACTOR INSTALLED <br /> Z <br /> 120 5 6 7 OFOI OWNER FURNISH/OWNER INSTALLED a- <br /> 15 / 9 <br /> L _'i ] w <br /> _ <br /> 4 11 SERVERY CFCI CONTRACTOR FURNISH /CONTRACTOR INSTALLED <br /> 42^�18 42^)18 123 <br /> N 0 <br /> 3 3 4 BUILDING WALLS (SEE ARCH. DWGS.) W Z <br /> 14 14 8 Cf3 <br /> N JN DRYS R � 7 (� =I= �j WALK-IN COOLER/FREEZER INSULATED WALLS <br /> It 14.1 115 1 iib b b ii C) <br /> l� A 0 O <br /> L0 1❑ KEY/SHEET NOTE _ <br /> Z U Z <br /> WATER HEATER O ITEM NUMBER SYMBOL (SEE EQUIPMENT O V <br /> 114 LU <br /> SCHEDULE FOR DESCRIPTION) <br /> V J U C14o <br /> KITCHEN O m O t2 o <br /> 1 ROOM/AREA NAME AND ROOM NUMBER > Q zo <br /> ( (; �-- - — COLUMN GRIDS WITH COLUMN INDICATORS <br /> 0 0 <br /> asps STORAGE SHELVING SIZES (Width x Length) '� CO U <br /> UF_ <br /> FOODSERVICE EQUIPMENT FLOOR PLAN 1 I ® I ACCESSIBLE CLEARANCES AND SYMBOL <br /> CO- 30"x48" MIN CLEARANCE F <br /> F <br /> SCALE : 1/4" = 1'-0" FS 1 . 1 48" CLR. <br /> OUTLINE OF FOODSERVICE EQUIPMENT <br /> r--------1 <br /> I 1 FOODSERVICE EQUIPMENT BELOW EQUIPMENT TOP <br /> I I <br /> L—___—J <br /> \ I FOODSERVICE EQUIPMENT ABOVE EQUIPMENT TOP <br /> MOBILE FOODSERVICE EQUIPMENT <br /> O <br /> F.E.C. (PROVIDE TYPE"K"AND 2A:10BC(MINIMUM)) <br /> FIRE EXTINGUISHER&CABINET REFER TO ARCH. <br /> F.E."K" DRAWINGS FOR FIRE EXTINGUISHER LOCATIONS <br /> FS.O I SHEET NUMBER <br /> WATER HEATER(SEE PLUMBING ENG. DWG.) <br /> 1 FS0.1 2 ELEVATION INDICATOR SYMBOL <br /> FOODSERVICE SHEET INDEX KITCHEN EQUIPMENT ANCHORAGE NOTES <br /> ALL KITCHEN EQUIPMENT SHALL BE ANCHORED AND INSTALLED PER THE DETAILS ON THE DSA <br /> FS1.1 - FOODSERVICE EQUIPMENT FLOOR PLAN APPROVED CONSTRUCTION DOCUMENTS.WHERE NO DETAIL IS INDICATED,THE FOLLOWING <br /> FS2.1 - FOODSERVICE EQUIPMENT PLUMBING PLAN COMPONENTS SHALL BE ANCHORED OR BRACED TO MEET THE FORCE AND DISPLACEMENT CLIENT <br /> FS3.1 - FOODSERVICE EQUIPMENT ELECTRICAL PLAN REQUIREMENTS PRESCRIBED IN THE 2016 CBC,SECTIONS 1616A.1.18 THROUGH 1616A.1.26 AND KIPP:PUBLIC SCHOOLS NORTHERN CALIFORNIA <br /> FS4.1 - FOODSERVICE EQUIPMENT WALL BACKING PLAN 2016 ASCE 7-10 CHAPTER 13,26 AND 30. PROJECT NUMBER <br /> FS8.1 - FOODSERVICE EQUIPMENT DETAILS P2102201 AR <br /> 1.ALL PERMANENT EQUIPMENT AND COMPONENTS. DATE 07/2/2021 <br /> 2.TEMPORARY OR MOVABLE EQUIPMENT THAT IS PERMANENTLY ATTACHED(e.g.HARD DRAWN BY: DR CHKED BY: CK <br /> WIRED)TO THE BUILDING UTILITY SERVICES SUCH AS ELECTRICITY,GAS OR WATER. <br /> NOTES: REVISIONS <br /> 3.MOVABLE EQUIPMENT WHICH IS STATIONED IN ONE PLACE FOR MORE THAN 8 HOURS # DESCRIPTION DATE <br /> 1. REFER TO ARCH.DRAWINGS FOR FIRE AND HEAVIER THAN 400 POUNDS OR HAS A CENTER OF MASS LOCATED 4 FEET OR <br /> 0 <br /> EXTINGUISHER LOCATIONS MORE ABOVE THE ADJACENT FLOOR OR ROOF LEVEL THAT DIRECTLY SUPPORT THE <br /> N COMPONENT ARE REQUIRED TO BE ANCHORED WITH TEMPORARY ATTACHMENTS. <br /> 2• "All work shall conform to the <br /> California Building Code,California <br /> m Electrical Code,California Mechanical THE FOLLOWING KITCHEN EQUIPMENT SHALL BE POSITIVELY ATTACHED TO THE STRUCTURE,BUT <br /> o and Plumbing Codes, California NEED NOT BE DETAILED ON THE PLANS.THESE COMPONENTS SHALL HAVE FLEXIBLE <br /> NI Health and Safety Code. CONNECTIONS PROVIDED BETWEEN THE COMPONENT AND ASSOCIATED DUCTWORK,PIPING,AND <br /> co ALL FOOD SERVICES EQUIPMENT CONDUIT. <br /> SHALL MEET AND BE INSTALLED PER ?+ <br /> U THE REQUIREMENTS OF THE A.COMPONENTS WEIGHING LESS THAN 400 POUNDS AND HAVE A CENTER OF MASS c <br /> N rnl CALIFORNIA HEALTH AND SAFETY LOCATED 4 FEET OR LESS ABOVE THE ADJACENT FLOOR OR ROOF LEVEL THAT CONSTRUCTION DOCUMENTS <br /> Q DIRECTLY SUPPORT THE COMPONENT. <br /> CODE DIVISION 22 AND ALL LOCAL <br /> o NI CD <br /> CODES AND ORDINANCES." B.COMPONENTS WEIGHTING LESS THAN 20 POUNDS,OR IN THE CASE OF DISTRIBUTED <br /> a <br /> SYSTEMS,LESS THAN 5 POUNDS PER FOOT,WHICH ARE SUSPENDED FROM A ROOF OR � FOODSERVICE <br /> FLOOR OR HUNG FROM A WALL. <br /> U <br /> LD <br /> O <br /> y <br /> N U FOR THOSE ELEMENTS THAT DO NOT REQUIRE DETAILS ON THE APPROVED DRAWINGS,THE EQUIPMENT <br /> INSTALLATION SHALL BE SUBJECT TO THE APPROVAL OF THE DESIGN PROFESSIONAL IN E FLOOR PLA N <br /> 3 GENERAL RESPONSIBLE CHARGE OR STRUCTURAL ENGINEER DELEGATED RESPONSIBILITY AND c <br /> Y <br /> THE DSA DISTRICT STRUCTURAL ENGINEER.THE PROJECT INSPECTOR WILL VERIFY THAT ALL <br /> N COMPONENTS AND EQUIPMENT HAVE BEEN ANCHORED IN ACCORDANCE WITH ABOVE t <br /> CD r` REQUIREMENTS. <br /> 10 c r <br /> O r <br /> r J N <br /> FS1 ol <br /> J O <br /> UI c <br />