WJ AIR DISTRIBUTION SCHEDULE SHEET INDEX
<br /> D
<br /> 0
<br /> W SYMBOL TYPE DESCRIPTION
<br /> 2 MO.01 MECHANICAL SHEET INDEX, LEGEND, NOTES &SCHEDULES pw
<br /> U M2.00 MECHANICAL DEMOLITION PLAN
<br /> (n ALUMINUM DIFFUSER WITH FIXED BARS PARALLEL TO LONG
<br /> Z03
<br /> 06 DEVICCEE, OUTLET O FLOOR DIMENSION. PENCIL PROOF CONSTRUCTION. NECK SIZE SHALL FIT TOP SWITCH, 24" MAX. M2.01 MECHANICAL FLOOR PLAN
<br /> (n SUPPLY EXISTING UNDERFLOOR PLENUM DIMENSIONS. "'THICK BARS AT ""
<br /> W SPACING AND 0 DEGREE DEFLECTION. TITUS MODEL CT-480. 4 FA MICROPHONE TOP OF SWITCH, M3.01 MECHANICAL ROOF PLAN ARCHITECT PBK-WLC,Inc.
<br /> DEVICE, OUTLET M6.01 MECHANICAL DETAILS PBK-WLC.com
<br /> O HEAVY DUTY SINGLE DEFLECTION FIXED HORIZONTAL BLADE GRILLE FA MICROPHONE SACRAMENTO
<br /> Z SIDEWALL WITH 2" BLADE SPACING AND 38 DEGREE DEFLECTION. 16 GA. 2520 Venture Oaks Way,Suite 440
<br /> z O
<br /> Z RETURN BORDER, 14 GA. BLADES WITH SUPPORT BARS AT 6"O.C. AND FRAME Sacramento,CA 95833
<br /> W FOR SURFACE MOUNT. TITUS MODEL 33RL. 916-682-9494 P
<br /> (D
<br /> J 46" MAX. Electrical Engineering
<br /> W O CEILING MODULAR CORE DIFFUSER WITH FRAME FOR SURFACE MOUNTING. 48" MAX. SIDE APPROACH
<br /> SUPPLY TITUS MODEL MCD.
<br /> Q 44" MAX.
<br /> Z 34" MAX. FRONT APPROACH L EA F
<br /> ENGINEERS
<br /> DOUBLE DEFLECTION REVERSIBLE CORE DIFFUSER WITH 5° DOWN APOKMMPAW
<br /> LLI O WALL BLADES AND 5/16" SPACING. ALUMINUM CONSTRUCTION AND FINISHED 2520 Venture Oaks Way,SuIte440 Sacramento,CA 95833
<br /> W
<br /> F SUPPLY FRAME FOR SURFACE MOUNTING. TITUS MODEL 1700L. FLOOR p916-682-9494 wwb#:P210220rAR
<br /> job#:p2102201AR
<br /> CO 15" MIN.
<br /> J1 if if
<br /> Q CEILING
<br /> (� O 35°ANGLE SINGLE DEFLECTION FIXED BLADE AT 1/2" O.C. WITH 2019 CBC 2019 CBC 2019 CBC
<br /> z E .RETURN & FRAME FOR SURFACE MOUNTINGTITUS MODEL 355RL.
<br /> Q TRANSFER 11 B-308.2.1 11 B-308.2.2 11 B-308.3.2
<br /> 2
<br /> U NOTE:
<br /> W CEILING1. THIS DETAIL APPLIES TO MOUNTING OF ANY MECHANICAL AND ELECTRICAL DEVICE WHICH CONTAINS AN OPERABLE PART THAT IS ADJUSTABLE BY THE OCCUPANT. THIS
<br /> OF RETURN & PERFORATED FACE DIFFUSER WITH 24"x24" FRAME FOR LAY-IN DOES NOT APPLY TO SENSORS OR CONTROLS THAT ARE ONLY ADJUSTABLE THROUGH THE BUILDING AUTOMATION SYSTEM (IE: TEMPERATURE AND HUMIDITY SENSORS).
<br /> O
<br /> TRANSFER T-BAR CEILING FLUSH FACE MOUNTING, TITUS MODEL PAR-3.
<br /> O
<br /> MOUNTING OVER OBSTRUCTION DETAIL
<br /> O CEILING PERFORATED FACE DIFFUSER WITH 24"x48" FRAME FOR LAY-IN N.T.S 01
<br /> T
<br /> RETURN T-BAR CEILING FLUSH FACE MOUNTING, TIS MODEL PAR-3. EXHAUST FAN SCHEDULE CAL-GREEN REQUIREMENTS MECHANICAL LEGEND
<br /> EF-1 EF-2 EF-3 1. TESTING AND ADJUSTING. TESTING AND ADJUSTING OF SYSTEMS SHALL BE REQUIRED FOR NEW SYMBOL ITEM
<br /> TYPE CENTRIFUGAL CENTRIFUGAL CENTRIFUGAL BUILDINGS LESS THAN 10,000 SQUARE FEET OR NEW SYSTEMS TO SERVE AN ADDITION OR ALTERATION ® SUPPLY AIR
<br /> SUBJECT TO SECTION 303.1
<br /> MOUNTING CEILING CEILING CEILING 2. SYSTEMS. DEVELOP A WRITTEN PLAN OF PROCEDURES FOR TESTING AND ADJUSTING SYSTEMS. ❑ RETURN AIR
<br /> WATTS/HP/BHP 49/-/- 16/-/- 16/-/- SYSTEMS TO BE INCLUDED FOR TESTING AND ADJUSTING SHALL INCLUDE, AS APPLICABLE TO THE ® EXHAUST AIR
<br /> PROJECT:
<br /> VOLTS/PHASE 115/ 1 115/ 1 115/ 1 A. HVAC SYSTEMS AND CONTROLS. ® OUTSIDE AIR
<br /> CFM 175 75 75 B. INDOOR AND OUTDOOR LIGHTING AND CONTROLS.
<br /> E.S.P. (IN. W.C.) 0.30 0.25 0.25 C. WATER HEATING SYSTEMS. DETAIL @E��_SHEET
<br /> DETAIL DNUMIGN TION
<br /> D. RENEWABLE ENERGY SYSTEMS.
<br /> DRIVE DIRECT DIRECT DIRECT E. LANDSCAPE IRRIGATION SYSTEMS. NO. WHERE SHOWN
<br /> FAN RPM 1400 900 900 F. WATER REUSE SYSTEMS.
<br /> 3. PROCEDURES. PERFORM TESTING AND ADJUSTING PROCEDURES IN ACCORDANCE WITH @f=-NUMBER
<br /> EQUIPMENT DESIGNATION
<br /> SONES/dBA 1.5/-- 0.4/-- 0.4/-- MANUFACTURE'S SPECIFICATIONS AND APPLICABLE STANDARDS ON EACH SYSTEM. UNIT ABBREVIATION z
<br /> SERVICE SEE PLAN SEE PLAN SEE PLAN A. HVAC BALANCING. IN ADDITION TO TESTING AND ADJUSTING, BEFORE A NEW N
<br /> CONTROL SEE NOTES SEE NOTES SEE NOTES SPACE-CONDITIONING SYSTEM SERVING A BUILDING OR SPACE IS OPERATED FOR NORMAL GRILLE DESIGNATION L.L
<br /> USE, BALANCE THE SYSTEM IN ACCORDANCE WITH THE PROCEDURES DEFINED BY THE
<br /> OPERATING WT. (LBS.) 26 15 15 TESTING ADJUSTING AND BALANCING BUREAU NATIONAL STANDARDS; THE NATIONAL 10x10-3�-NECK SIZE & BLOW O
<br /> NOTES: MANUFACTURER GREENHECK GREENHECK GREENHECK ENVIRONMENTAL BALANCING BUREAU PROCEDURAL STANDARDS; ASSOCIATED AIR BALANCE A 120, F/S-FIRE/SMOKE DAMPER WHERE REQ'D LL
<br /> �� J
<br /> 1. EQUIVALENT MODELS OF TITUS, NAILOR, KRUEGER, ANEMOSTAT, PRICE OR J&J ARE MODEL SP-A190 SP-A90 SP-A90 COUNCIL NATIONAL STANDARDS OR AS APPROVED BY THE ENFORCING AGENCY. CFM4. REPORTING. AFTER COMPLETION OF TESTING, ADJUSTING AND BALANCING, PROVIDE A FINAL REPORT _--_- ACOUSTIC LINED DUCT
<br /> ACCEPTABLE. G
<br /> 2. REFER TO THE FLOOR PLANS FOR NECK SIZE, CFM, AIR DIFFUSION PATTERN AND FIRE/ NOTES: OF TESTINSIGNED BY THE INDIVIDUAL RESPONSIBLE FOR PERFORMING THESE SERVICES.5. OPERATION AND MAINTENANCE (O & M) MANUAL. PROVIDE THE BUILDING OWNER OR REPRESENTATIVE40
<br /> TURNING VANES U
<br /> SMOKE DAMPER, IF REQUIRED. 1. PROVIDE BACKDRAFT DAMPER, THREADED HANGER SUPPORT. WITH DETAILED OPERATING AND MAINTENANCE INSTRUCTIONS AND COPIES OF DUCT FLEXIBLE CONNECTION
<br /> 3. PROVIDE AIR CONTROL GRID FOR ALL CEILING SUPPLY DIFFUSERS SET AT 90°. 2. PROVIDE FACTORY SOLID STATE SPEED CONTROLLER MOUNTED WITHIN THE FAN CASING. GUARANTIES/WARRANTIES FOR EACH SYSTEM. O & M INSTRUCTIONS SHALL BE CONSISTENT WITH z
<br /> 4. INTERIOR PAINTED FLAT BLACK. 3. INTERLOCK EF-1 WITH RESPECTIVE TOILET ROOM LIGHT/OCCUPANCY SENSORS. FAN SHALL CONTINUE TO OPERATE OSHA REQUIREMENTS IN CCR, TITLE 8, SECTION 5142, AND OTHER RELATED REGULATIONS. SUPPLY DUCT THRU ROOF N
<br /> A MINIMUM OF 10 MINUTES AFTER SENSOR HAS ACTIVATED. A. INSPECTIONS AND REPORTS. INCLUDE A COPY OF ALL INSPECTION VERIFICATIONS AND RETURN DUCT THRU ROOF LL
<br /> 4. PROVIDE GREENHECK GRSR SPUN ALUMINUM ROOF RELIEF AIR CAP AND ROOF CURB. REPORTS REQUIRED BY THE ENFORCING AGENCY. I LM UJ
<br /> 5. PROVIDE WITH COMPLIANCE WITH ASHRAE 62.2 CALIFORNIA TITLE 24 REQUIREMENTS. 6. TEMPORARY VENTILATION. THE PERMANENT HVAC SYSTEM SHALL ONLY BE USED DURING VOLUME CONTROL DAMPER
<br /> 6. PROVIDE STANDARD PLASTIC NON-YELLOWING GRILLE. CONSTRUCTION IF NECESSARY TO CONDITION THE BUILDING WITHIN THE REQUIRED TEMPERATURE FIRE/SMOKE DAMPER W/ACCESS
<br /> 7. PROVIDE SEPARATE ON-OFF SWITCH CONTROL FOR EF-2. RANGE FOR MATERIAL AND EQUIPMENT INSTALLATION. IF THE HVAC SYSTEM IS USED DURING N
<br /> 8. PROVIDE SEPARATE THERMOSTAT CONTROL FOR EF-3 SET THERMOSTAT TO START FAN OPERTION AT 80 F.
<br /> CONSTRUCTION, USE RETURN AIR FILTERS WITH A MINIMUM REPORTING VALUE (MERV) OF 13, BASED AAAAA OPPOSED BLADE DAMPER L.L ON ASHRAE 52.2-1999 OR AN AVERAGE EFFICIENCY OF 30 PERCENT BASED ON ASHRAE 52.1-1992. BACKDRAFT DAMPER N O
<br /> REPLACE ALL FILTERS IMMEDIATELY PRIOR TO OCCUPANCY, OR, IF THE BUILDING IS OCCUPIED DURING
<br /> EXISTING AIR CONDITIONER SCHEDULE
<br /> ALTERATIONS, AT THE CONCLUSION OF CONSTRUCTION. 0 EMS TEMP. SENSOR/THERMOSTAT, MOUNT @ 48"AFF TO TOP OF BOX W Z
<br /> 7. COVERING OF DUCT OPENINGS AND PROTECTION OF MECHANICAL EQUIPMENT DURING OB BYPASS TIMER Cn
<br /> CONSTRUCTION. AT THE TIME OF ROUGH INSTALLATION AND DURING STORAGE ON THE J
<br /> NUMBER (E)AC-1 (E)AC-2 (E)AC-3 (E)AC-4 (E)AC-5 CONSTRUCTION SITE UNTIL FINAL STARTUP OF THE HEATING, COOLING AND VENTILATION EQUIPMENT, O SWITCH T
<br /> ALL DUCT AND OTHER RELATED AIR DISTRIBUTION COMPONENT OPENINGS SHALL BE COVERED WITH (E) EXISTING i O
<br /> TYPE GAS/ELECTRIC GAS/ELECTRIC GAS/ELECTRIC GAS/ELECTRIC GAS/ELECTRIC WRAP, PLASTIC, SHEET METAL OR OTHER METHODS ACCEPTABLE TO THE ENFORCING AGENCY TO O
<br /> NOMINAL TONS 4.0 4.0 4.0 4.0 4.0 REDUCE THE AMOUNT OF DUST, WATER AND DEBRIS WHICH MAY ENTER THE SYSTEM. (N) NEW
<br /> 8. FILTERS. IN MECHANICALLY VENTILATED BUILDINGS, PROVIDE REGULARLY OCCUPIED AREAS OF THE METAL& FLEXIBLE DUCT
<br /> Of SUPPLY AIR CFM 1680 1680 1680 1680 1800 BUILDING WITH AIR FILTRATION MEDIA FOR OUTSIDE AND RETURN AIR PRIOR TO OCCUPANCY THAT
<br /> 3: E.S.P. (IN. W.C.) 0.55 0.55 0.55 0.55 0.55 PROVIDE AT LEAST A MINIMUM EFFICIENCY REPORTING VALUE (MERV) OF 13. MERV 13 FILTERS SHALL -0 PIPE RISER Z Z
<br /> m MIN. OUTSIDE AIR CFM -- __ __ __ BE INSTALLED PRIOR TO OCCUPANCY AND RECOMMENDATIONS FOR MAINTENANCE WITH FILTERS OF PIPE DROP O U) O
<br /> THE SAME VALUE SHALL BE INCLUDED IN THE OPERATION AND MAINTENANCE MANUAL. Z
<br /> EXCEPTIONS: -CWS- CHILLED WATER SUPPLY U w
<br /> COOLING TYPE DX DX DX DX DX A. AN ASHRAE 10-PERCENT TO 15-PERCENT EFFICIENCY FILTER SHALL BE PERMITTED FOR AN -CWR- CHILLED WATER RETURN �
<br /> HVAC UNIT MEETING THE 2019 CALIFORNIA ENERGY CODE HAVING 60,000 BTY/H OR LESS J U U
<br /> TOTAL CAP. (MBH) -- -- 45.1 45.1 45.1 Lu O O
<br /> CAPACITY PER FAN COIL, IF THE ENERGY USE OF THE AIR DELIVERY SYSTEM IS 0.4 W/CFM OR -HWS- HEATING WATER SUPPLY =) C14 O
<br /> 0 SENS. CAP. (MBH) -- -- 33.2 33.2 33.2 LESS AT DESIGN AIR FLOW. -HWR- HEATING WATER RETURN O O w Z
<br /> O E.A. DB (°F) 80 80 80 80 80 B. EXISTING MECHANICAL EQUIPMENT. ♦� > Q O
<br /> U E.A. WB (°F) 67 67 67 67 67 9 AOZONE DEPLETION AND ND FIRE SUPPRESSION EQUIPMEOUSE GAS REDUCTIONS.NT SHALL COMPLY WITH IS SECTIONS 150NS.5 8.0F HVAC,1 1 AND 5.508.1.2.REFRIGERATION �- INCREASER/REDUCER �/♦ � � cn Z U
<br /> AMB. TEMP. (°F) 105 105 105 105 105 A. CHLOROFLOUROCARBONS (CFCS). INSTALL HVAC, REFRIGERATION AND FIRE SUPPRESSION SAFETY RELIEF VALVE Q O
<br /> HEATING TYPE GAS GAS GAS GAS GAS EQUIPMENT THAT DO NOT CONTAIN CFCS. �� GATE VALVE QO U
<br /> B. HALONS. INSTALL HVAC REFRIGERATION AND FIRE SUPPRESSION EQUIPMENT THAT DO NOT Z
<br /> INPUT(MBH) 72.0 72.0 72.0 72.0 72.0 CONTAIN HALONS. GLOBE VALVE c� O
<br /> O
<br /> w OUTPUT(MBH) 59.4 59.4 59.0 59.0 59.0 10. ADHESIVES, ADHESIVE BONDING PRIMERS, ADHESIVE PRIMERS, SEALANTS, SEALANT PRIMERS AND �b� PLUG VALVE ti N U
<br /> = FUEL NATURAL GAS NATURAL GAS NATURAL GAS NATURAL GAS NATURAL GAS CAULKS SHALL COMPLY WITH LOCAL OR REGIONAL AIR POLLUTION CONTROL OR AIR QUALITY BALL VALVE
<br /> MANAGEMENT DISTRICT RULES WHERE APPLICABLE, OR SCAQMD RULE 1168 VOC LIMITS,AS SHOWN IN
<br /> U POWER SUPPLY 208/3/60 208/3/60 208/3/60 208/3/60 208/3/60 TABLES 5.504.4.1 -f- CHECK VALVE
<br /> w COMP RLA/ FAN FLA 13.5/4.9 13.5/4.9 13.7/5.2 13.7/5.2 13.7/5.2 STRAINER w KI PP:Public Schools
<br /> UNIT MCA/MOCP 22.5/30.0 22.5/30.0 26.0/30.0 26.0/30.0 26.0/30.0 BUTTERFLY VALVE
<br /> SERVICE SEE PLAN SEE PLAN SEE PLAN SEE PLAN SEE PLAN MEP COMPONENT ANCHORAGE NOTE NEEDLE VALVE NORTHERN CALIFORNIA
<br /> MANUFACTURER BRYANT BRYANT CARRIER CARRIER CARRIER 3-WAY VALVE
<br /> MODEL 581BPV048 581BPV048 48TCDA05 48TCDA05 48TCDA05 ALL MECHANICAL, PLUMBING AND ELECTRICAL COMPONENTS SHALL BE ANCHORED AND INSTALLED PER ---
<br /> THE DETAILS ON THE APPROVED CONSTRUCTION DOCUMENTS. THE FOLLOWING COMPONENTS SHALL BE BALANCING VALVE
<br /> NOTES: ANCHORED OR BRACED TO MEET THE FORCE AND DISPLACEMENT REQUIREMENTS PRESCRIBED IN THE 2019 T SENSOR WELL
<br /> 1. PROVIDE NEW THERMOSTAT AND LOCATE WHERE INDICATED ON FLOOR PLAN. COORDINATE LOCATION WITH ALL CBC, SECTIONS 1617A.1.18 THROUGH 1617A.1.26 AND ASCE 7-16 CHAPTER 13, 26 AND 30: THERMOMETER
<br /> WALL APPURTENANCES AND INSTALL TO MEET CBC REQUIREMENTS. 17
<br /> 2. PERFORM FIELD INVESTIGATION AND PRE DECONSTRUCTION AIR-BALANCE OF EACH EXISTING UNIT AND SYSTEM. 1. ALL PERMANENT EQUIPMENT AND COMPONENTS. PRESSURE GAUGE
<br /> PROVIDE AIR-BALANCE REPORT COMPLETE WITH TESTING RESULTS OF ALL UNIT COMPONENTS AND TESTING 2. TEMPORARY, MOVABLE OR MOBILE EQUIPMENT THAT IS PERMANENTLY ATTACHED (e.g. HARD
<br /> PROCEDURE USED. ALL COILS AND HEAT EXCHANGER SHALL BE PRESSURE TESTED AND INSPECTED FOR LEAKS, WIRED)TO THE BUILDING UTILITY SERVICES SUCH AS ELECTRIC, GAS OR WATER. "PERMANENTLY + GAUGE COCK
<br /> REFRIGERANT PIPING TESTED FOR LEAKS AND RECHARGED, CONTROLS SHALL BE TESTED AND RE-CALIBRATED FOR ATTACHED"SHALL INCLUDE ALL ELECTRICAL CONNECTIONS EXCEPT PLUGS FOR 110/220 VOLT FS FLOW SWITCH
<br /> FULL OPERATION, CASEWORK SHALL BE INSPECTED FOR DAMAGE OR LEAKS. REPORT SHALL BE REVIEWED BY RECEPTACLES HAVING A FLEXIBLE CABLE. Al
<br /> 3. TEMPORARY, MOVABLE OR MOBILE EQUIPMENT WHICH IS HEAVIER THAN 400 POUNDS OR HAS A Y THERMOMETER WELL
<br /> ENGINEER OF RECORD. CENTER OF MASS LOCATED 4 FEET OR MORE ABOVE THE ADJACENT FLOOR OR ROOF LEVEL THAT
<br /> DIRECTLY SUPPORT THE COMPONENT IS REQUIRED TO BE RESTRAINED IN A MANNER APPROVED D MOISTURE SENSOR
<br /> BY DSA. PRESSURE REGULATING VALVE
<br /> THE FOLLOWING MECHANICAL AND ELECTRICAL COMPONENTS SHALL BE POSITIVELY ATTACHED TO THE A PIPING FIRE WALL PENETRATION
<br /> STRUCTURE BUT NEED NOT DEMONSTRATE DESIGN COMPLIANCE WITH THE REFERENCES NOTED ABOVE. �� POINT OF CONNECTION 1 P2 P3 P4 P5 P6
<br /> THESE COMPONENTS SHALL HAVE FLEXIBLE CONNECTIONS PROVIDED BETWEEN THE COMPONENT AND EXHAUST DUCT THRU ROOF
<br /> ASSOCIATED DUCTWORK, PIPING, AND CONDUIT. FLEXIBLE CONNECTIONS MUST ALLOW MOVEMENT IN
<br /> BOTH TRANSVERSE AND LONGITUDINAL DIRECTIONS: DUCT SMOKE DETECTOR N
<br /> 1. COMPONENTS WEIGHING LESS THAN 400 POUNDS AND HAVE A CENTER OF MASS LOCATED 4 FEET _CS_ COMBO HOT/CHILLED WATER SUPPLY
<br /> OR LESS ABOVE THE ADJACENT FLOOR OR ROOF LEVEL THAT DIRECTLY SUPPORT THE _CR- COMBO HOT/CHILLED WATER RETURN PLAN TRUE
<br /> COMPONENT. KEY PLAN NORTH NORTH
<br /> 2. COMPONENTS WEIGHING LESS THAN 20 POUNDS, OR IN THE CASE OF DISTRIBUTED SYSTEMS, LESS O RA TEMP. SENSOR
<br /> THAN 5 POUND PER FOOT, WHICH ARE SUSPENDED FROM A ROOF OR FLOOR OR HUNG FROM A O CARBON DIOXIDE SENSOR
<br /> WALL.
<br /> O PRESSURE SENSOR
<br /> THE ANCHORAGE OF ALL MECHANICAL, ELECTRICAL AND PLUMBING COMPONENTS SHALL BE SUBJECT TO TEMPERATURE CONTROL PANEL
<br /> THE APPROVAL OF THE DESIGN PROFESSIONAL IN GENERAL RESPONSIBLE CHARGE OR STRUCTURAL
<br /> ENGINEER DELEGATED RESPONSIBILITY
<br /> IINSPECTOR
<br /> WITHSEQ
<br /> THAT ALL COMPONENTS AND EQU EQUIPMENT HAVE BEEN ANCHORED N ACCORDANCE ABOVE ILL VERIFY UNLESS OTHERWISE NOTED O ROFESS/pN4l
<br /> REQUIREMENTS. TRANSFER AIR GRILLE \�� �M.�E/yCF��
<br /> ABOVE FINISHED FLOOR 2
<br /> QPOD POINT OF DISCONNECT 0. 333 0rn
<br /> PIPING , DUCTWORK, AND ELECTRICAL POC POINT OF CONNECTION * REN.6-3 2 . .
<br /> DISTRIBUTION SYSTEM BRACING NOTE ci
<br /> GENERAL NOTES sT �F�HAW\
<br /> 9TF pF
<br /> PIPING, DUCTWORK, AND ELECTRICAL DISTRIBUTION SYSTEMS SHALL BE BRACED TO COMPLY WITH THE 1. ALL BRACING OF DUCTS AND PIPING SHALL BE INSTALLED IN ACCORDANCE WITH SMACNA
<br /> FORCES AND DISPLACEMENTS PRESCRIBED IN ASCE 7-16 SECTION 13.3 AS DEFINED IN ASCE 7-16 SECTION GUIDELINES AND 2019 C.B.C. AS APPROVED BY CITY OF STOCKTON BUILDING DEPARTMENT.
<br /> 13.6.5, 13.6.6, 13.6.7, 13.6.8; AND 2019 CBC, SECTION 1617A.1.24, 1617A.1.25, AND 1617A.1.26.
<br /> 2. WHERE BRACING DETAILS ARE NOT SHOWN ON THE DRAWING OR IN THE GUIDELINES, THE FIELD CLIENT
<br /> THE METHOD OF SHOWING BRACING AND ATTACHMENTS TO THE STRUCTURE FOR THE IDENTIFIED INSTALLATION SHALL BE SUBJECT TO THE APPROVAL OF THE ARCHITECT, MECHANICAL ENGINEER (KIPP:PUBLIC SCHOOLS NORTHERN CALIFORNIA
<br /> DISTRIBUTION SYSTEM ARE AS NOTED BELOW. WHEN BRACING AND ATTACHMENTS ARE BASED ON A AND LOCAL BUILDING DEPARTMENT FIELD ENGINEER.
<br /> PREAPPROVED INSTALLATION GUIDE (E.G., OSHPD OPM FOR 2013 CBC OR LATER), COPIES OF THE BRACING PROJECT NUMBER
<br /> SYSTEM INSTALLATION GUIDE OR MANUAL SHALL BE AVAILABLE ON THE JOBSITE PRIOR TO START OF AND 3. A COPY OF THE GUIDELINES PUBLISHED BY SMACNA AND APPROVED BY CITY OF STOCKTON BUILDING P2102201 AR
<br /> DURING THE HANGING AND BRACING OF DISTRIBUTION SYSTEMS. THE STRUCTURAL ENGINEER OF RECORD DEPARTMENT SHALL BE PROVIDED BY THE CONTRACTOR AND KEPT ON THE JOB AT ALL TIMES.
<br /> CL SHALL VERIFY ADEQUACY OF THE STRUCTURE TO SUPPORT THE HANGER AND BRACE LOADS. DATE: 07/01/2021
<br /> W 4. CONTRACTOR SHALL COORDINATE ALL DUCTWORK ROUTING WITH WORK OF OTHER TRADES AND
<br /> MECHANICAL PIPING (MP), MECHANICAL DUCTS (MD), PLUMBING PIPING (PP), ELECTRICAL DISTRIBUTION MAKE ANY OFFSETS AS REQUIRED TO AVOID CONFLICT WITH PIPING, LIGHT FIXTURES, TRUSSES, ETC. DRAWN BY: KF CHECKED BY: RT
<br /> cn SYSTEMS (E): REVISIONS
<br /> U 5. CONTRACTOR SHALL COORDINATE ALL GRILLE LOCATIONS AND CEILING TYPES PRIOR TO ORDERING # DESCRIPTION DATE
<br /> Q MP®MD®PP❑E❑ OPTION 1: DETAILED ON THE APPROVED DRAWINGS WITH PROJECT GRILLES. SEE ARCHITECTURAL CEILING PLANS AND ELECTRICAL LIGHTING PLANS.
<br /> Q SPECIFIC NOTES AND DETAILS.
<br /> U 6. CONTRACTOR SHALL VERIFY/COORDINATE VOLTAGE OF ALL EQUIPMENT PRIOR TO ORDERING ANY
<br /> EQUIPMENT. SEE ELECTRICAL DRAWINGS.
<br /> MP❑MD❑PP❑E❑ OPTION 2: SHALL COMPLY WITH THE APPLICABLE OSHPD
<br /> m PRE-APPROVAL (OPM-0295-13).
<br /> ca
<br /> 00
<br /> U)
<br /> 0
<br /> °>° CONSTRUCTION DOCUMENTS
<br /> 0
<br /> Q
<br /> MECHANICAL
<br /> SHEET INDEX,
<br /> N
<br /> N
<br /> O
<br /> LEGEND, NOTES
<br /> N �
<br /> d W
<br /> N co
<br /> CO
<br /> & SCHEDULES
<br /> U _
<br /> � N
<br /> O
<br /> O N
<br /> ^L \
<br /> LL O
<br /> N co M0101