My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1097
>
2300 - Underground Storage Tank Program
>
PR0231497
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2023 2:41:35 PM
Creation date
1/11/2022 1:20:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231497
PE
2361
FACILITY_ID
FA0000279
FACILITY_NAME
ESCALON MINI MART
STREET_NUMBER
1097
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
ESCALON
Zip
95320
APN
22510001
CURRENT_STATUS
01
SITE_LOCATION
1097 YOSEMITE AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br /> 1 . Site map enclosed? YES [ ] NO [ ] <br /> 2 . Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that Is repaired or replaced . Ensure a copy of the "Site Health and Safety <br /> Plan" is available on the jobsite as required by Title 88 <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements . If repairing a component, describe how this will be done. (If <br /> adding piping, UDC's , or other UST equipment, or performing tank top upgrade , use the UST Installation Application <br /> pages 4 -8 as necessary for a timely plan review) . <br /> Install new ULS Sensor In UDC 7/8 due to failed Monitor Cert Test . <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval) : <br /> Franklin ULS <br /> E <br /> , <br /> I <br /> EH230038 (revised 12-11 -15) 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.