Laserfiche WebLink
UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br /> 1 . Site map enclosed? YES [ ] NO [ ] <br /> 2 . Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that Is repaired or replaced . Ensure a copy of the "Site Health and Safety <br /> Plan" is available on the jobsite as required by Title 88 <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements . If repairing a component, describe how this will be done. (If <br /> adding piping, UDC's , or other UST equipment, or performing tank top upgrade , use the UST Installation Application <br /> pages 4 -8 as necessary for a timely plan review) . <br /> Install new ULS Sensor In UDC 7/8 due to failed Monitor Cert Test . <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval) : <br /> Franklin ULS <br /> E <br /> , <br /> I <br /> EH230038 (revised 12-11 -15) 3 <br />