Laserfiche WebLink
__ . <br />...__..__ . <br />Part 3. FACILITY INFORMATION <br />A. PROPOSED CHANGE (Check applicable box(es)): <br />®1. DESIGN (describeX Add biomassgasifier, add C&D Processing Line; add aeration equipment for composting; <br />increase desi,n capac <br />Increase daily tonnage to 1,800 TPD expand C&D operations area and capacity; increase <br />public materials receipt hours; increase Inert Debris processing area; increase hours for <br />x <br />2. OPERATION (describe): 0120 sstnn. Ingrease traffic voluoig: add food WAstlf' tQ compostina feedstocks. <br />❑3. OWNER OPERATOR, ADDRESS, AND/OR FACILITY NAME CHANGE (describe): n1a <br />®4. OTHER (describe): n/a. <br />B. FACILITY INFORMATION: <br />1. INFORMATION APPLICABLE TO ALL FACILITIES <br />a. PEAK DAILY TONNAGE OR CUBIC YARDS 1,800 TPD (MSW), 1,038 Tons per Week (composting) <br />1) DISPOSAUTRANSFER (unit) 1,800 TPD <br />2) OTHER (unit) n1a <br />b. DAILY DESIGN TONNAGE (TPD) <br />c. FACILITY SIZE (acres) <br />TPD <br />51.7 <br />d. PEAK TRAFFIC VOLUME PER DAY (vpd) 1,245 VPD <br />Hours for Receipt of Materials: Commercial, 4 AM to 6 PMIMonday-Saturday; Self haul, 6 <br />AM to 6 PMIMonday-Saturday. Processing hours: Indoors - 24 hours/Monday-Sunday, <br />Outdoors - 6 AM to 10 PM1Monday-Sunday. Maintenance Hours: 24 hours/Monday-Sunday. <br />e. DAYS AND HOURS OF OPERATION <br />2. ADDITIONAL INFO. REQUIRED FOR COMPOSTING FACILITIES ONLY: <br />a. SITE STORAGE CAPACITY (cu.yds) 49,200 cu. yds. <br />3. ADDITIONAL INFORMATION REQUIRED FOR LANDFILLS ONLY: <br />a. AVERAGE DAILY TONNAGE (TPD) n1a <br />b. SITE CAPACITY CURRENTLY PERMITTED (Airspace) (cu yds) <br />c. SITE CAPACITY PROPOSED (Airspace) (cu yds) <br />d. SITE CAPACITY USED TO DATE (Airspace) (cu yds) <br />e. SITE CAPACITY REMAINING (Airspace) (cu yds) <br />I. DATE OF CAPACITY INFORMATION (Date) (See instructions): <br />g. LAST PHYSICAL SITE SURVEY (Date) n1a <br />h. ESTIMATED. CLOSURE DATE (month and year) <br />1. DISPOSAL FOOTPRINT (acres) n1a <br />j. SITE CAPACITY PLANNED (cu yds) n1a <br />n1a <br />r17F1 <br />n1a <br />n1a <br />nip <br />n►a <br />k. 1. h IN-PLACE WASTE DENSITY (Ibs of waste per cu yd of waste) n1a <br />AND <br />(ii) WASTE -TO -COVER RATIO (Estimated) (v:v) n/a <br />OR <br />2. AIRSPACE UTILIZATION FACTOR (tons of waste per cu yd of landfill airspace) n1a <br />Pan: 4. SOURCEOF WATER SUPPLY (Check applicable boxes) <br />®A. MUNICIPAL OR UTILITY SERVICE: <br />MB. INDIVIDUAL (wells): All water for facility operations, including potable water will be obtained from an on site <br />®C. SURFACE SUPPLY: supply well. <br />1. NAME OF STREAM, LAKE, ETC-: <br />2- TYPE OF WATER RIGHTS: <br />QRIPARIAN ®APPROPRIATION <br />3. STATE PERMIT OR LICENSE NUMBER, IF APPLICABLE: <br />Page 2 <br />