My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2023 11:13:59 AM
Creation date
1/12/2022 2:26:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) 87 87 91 DSL <br /> Are both vent and tank riser piping V/ Yes �/ Yes Yes Yes <br /> secondarily contained? No No No No <br /> OPE Model OPW 7190 OPW 7130 OPW 7160 OPW 7130 <br /> What is the OPE response when activated? :1471 Shut off AShut off AShut off f Shut off <br /> (Check all that apply.) Flow Flow w Flow <br /> estricts estrictsbZtricts. Restricts <br /> Flow Flow Flow Flow <br /> Audible Audible Audible Audible <br /> Alarm Alarm Alarm Alarm <br /> Visual Visual Visual Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping Yes* Yes* Yes* Yes* <br /> that may interfere with the OPE operation? No No �/ No No <br /> At what level in the tank is the OPE set to <br /> activate? inches from bottom of tank 103 3/4" 104 3/8" 102 5/8-' 103 1/8* <br /> What is the percent capacity of the tank at <br /> 92% 93% 92% 92$ <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to �/ Yes A Yes A Yes /jYes <br /> respond when the stored substance No No No No <br /> reaches the designated regulatory level? <br /> 1. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results / Pass Pass Pass �/ Pass <br /> Fail Fail Fail Fail <br /> 8. COMMENTS <br /> Describe all results marked "Fail'and each proposed remedy. <br /> * Mark here if: <br /> Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.