Laserfiche WebLink
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6 , OVERFILL ' PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) Tl 87 T2 91 T3 Diesel <br /> Are both vent and tank riser piping Yes Yes / I Yes Yes <br /> secondarily contained ? No No No No <br /> OPE Model Veeder Root Veeder Root Veeder Root <br /> What is the OPE response when activated ? Shut off Shut off Shut off Shut off <br /> (Check all that apply.) Flow Flow Flow Flow <br /> estricts estricts estricts Restricts <br /> Flow Flow Flow Flow <br /> Audible V/ Audible V/ Audible Audible <br /> Alarm Alarm Alarm Alarm <br /> Visual r/ Visual �/ Visual Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping Yes* Yes * Yes* Yes* <br /> that may interfere with the OPE operation ? ✓ No �/ No No No <br /> At what level in the tank is the OPE set to <br /> loon 99 3 / e " 99 / g " <br /> activate ? Inches from bottom of tank) <br /> What is the percent capacity of the tank at <br /> 90 % 90 % 90 % <br /> which the OPE activates ? <br /> Is the OPE in proper operating condition to �41 Yes ✓ Yes Yes Yes <br /> respond when the stored substance No No No No <br /> reaches the designated regulatory level ? <br /> 7 . SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results Pass V/ Pass vl Pass Pass <br /> Fail Fail Fail Fail <br /> 8 , COMMENTS <br /> Describe all results marked "Fail" and each proposed remedy, <br /> * Mark here if: <br /> riFlow restrictors interfere with overfill prevention and equipment repairs required . <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In - Tank Setup reports) <br /> Page 2 of 2 <br />