Laserfiche WebLink
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> T1:SUPREME T2:REGULAR <br /> Tank ID (one OPE per column) UNLEADED UNLEADED <br /> Are both vent and tank riser piping r. Yes Yes r Yes r Yes <br /> secondarily contained? r No No No No <br /> OPE Model oPW oPW <br /> W Shut off W Shut off ' Shut off ' Shut off <br /> Flow Flow Flow Flow <br /> ' Restricts ' Restricts ' Restricts ' Restricts <br /> What is the OPE response when activated? Flow Flow Flow Flow <br /> (Check all that apply) '- Audible ' Audible ' Audible Audible <br /> Alarm Alarm Alarm Alarm <br /> r Visual ' Visual ' Visual ' Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping r Yes* Yes* r Yes* r Yes* <br /> that may interfere with the OPE operation? l: No No r No r No <br /> At what level in the tank is the OPE set to 104.5 104.5 <br /> activate? (Inches from bottom of tank) <br /> What is the percent capacity of the tank at <br /> which the OPE activates? 94.5 94.4 <br /> Is the OPE in proper operating condition to r Yes Yes Yes Yes <br /> respond when the stored substance reaches r No No r No r No <br /> the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results r Pass Pass Pass Pass <br /> r Fail Fail Fail Fail <br /> 8. COMMENTS <br /> Describe all results marked "Fail"and each proposed remedy. <br /> *Mark here if: <br /> ''- Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br />