My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1442
>
2300 - Underground Storage Tank Program
>
PR0518458
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2022 8:32:19 AM
Creation date
1/12/2022 4:13:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0518458
PE
2361
FACILITY_ID
FA0013918
FACILITY_NAME
CHEVRON STATION #210997*
STREET_NUMBER
1442
STREET_NAME
COLONY
STREET_TYPE
Dr
City
RIPON
Zip
95366
APN
26102028
CURRENT_STATUS
01
SITE_LOCATION
1442 Colony Dr
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 25: INSTALL WARNING PLATE <br /> Bend the three warning plate ears down then slide the <br /> tie wrap over the warning plate ears and position warn- <br /> ing plate against riser pipe approximately 1"below the <br /> adaptor. Tighten the tie wrap securely. The valve is <br /> now fully installed and in operating position. <br /> Q <br /> NOTE: the warning plate includes important warn- <br /> ings,operating parameters,and listing information <br /> and must be installed. '� <br /> l0,0 <br /> Manufacturer:"OPW" <br /> Model:"7150-4" <br /> (4" represents size) <br /> Manufacture Date: <br /> "MPC MMYY" <br /> MM=Month YY=Year <br /> ?W4 <br /> Plate <br /> Figure 26-Product Identification <br /> Figure 23 <br /> STEP 26: VALVE REMOVAL <br /> The valve can be removed for tank leak testing,inspec- <br /> tion,etc.,by removing the Rotatable Product Adaptor, <br /> the 4"ni pple,and the Jack Screw Kit, Reinstall per the <br /> above instructions. <br /> For tastable models only: It is not necessary to re- <br /> move the valve to check poppet movement 1 function. <br /> See Page 17 for full testing details. <br /> STEP 27: ELECTRONIC LIQUID LEVEL MONITORING <br /> If an electronic level monitor is installed, it must be cali- <br /> brated to match the top of the 7150 valve body,which <br /> must correlate with 95°/a of the actual tank capacity. <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.