My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0084717_SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
285
>
2600 - Land Use Program
>
SR0084717_SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2022 12:18:44 PM
Creation date
1/13/2022 9:53:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SR0084717
PE
2602
FACILITY_NAME
285 S AUSTIN RD
STREET_NUMBER
285
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
22802048
ENTERED_DATE
1/12/2022 12:00:00 AM
SITE_LOCATION
285 S AUSTIN RD
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1028
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Eastern San Joaquin Groundwater Basin Groundwater Management Plan <br />Northeastern San Joaquin County Section 8 <br />Groundwater Banking Authority 113 Integrated Conjunctive Use Program <br />Assuming the Freeport Project is utilized by EBMUD in one-third of all years and the County is <br />able to secure a wet-year water right on the American River, the maximum annual diversion <br />amount would be approximately 65,000 af/yr at an average annual yield of 44,000 af/yr. The <br />Water Availability Study suggests that in years when EBMUD is not utilizing the Freeport <br />Project, the full amount will be available to the Authority under the County Water Right. <br />Additional supplies obtained through third party groundwater banking and water transfers could <br />also increase the yield to the Authority. <br />8.2.2 MORE WATER PROJECT <br />In 1990 the Mokelumne River Water and Power Authority (MRWPA) filed a water right <br />application with the SWRCB for unappropriated wet year flows on the Mokelumne River. The <br />application cited three alternatives for the capture of water at the proposed Middle Bar <br />Reservoir, a new “On-stream” 40,000 to 434,000 af reservoir, the proposed Duck Creek <br />Reservoir, a new “Off-stream” 100,000 to 150,000 af regulating reservoir, or through direct <br />diversions off the Lower Mokelumne River between Camanche Reservoir and Interstate 5. The <br />classic alternatives are collectively known as the Mokelumne River Regional Water Storage and <br />Conjunctive Use Project (MORE WATER Project). <br />The MRWPA filed an additional water right application for power generation at the proposed <br />Middle Bar Dam with an estimated power generation capacity of approximately 85 megawatts <br />(MW) per year. The MRWPA also obtained 3 consecutive Preliminary Permits from the Federal <br />Energy Regulatory Commission (FERC) for the proposed Middle Bar Dam alternative. The <br />fourth consecutive Preliminary Permit, obtained for the proposed Duck Creek Reservoir <br />alternative on January 22, 2004, is current for a period of three years through December 2006. <br />The Preliminary Permit protects the MRWPA’s priority to study the power generation potential of <br />the proposed Duck Creek Reservoir (FERC, 2004). <br />In 2003 the MRWPA retained the services of HDR, Inc. in order to fully evaluate the engineering <br />feasibility of the MORE WATER Project and devise and implement a strategy that would satisfy <br />the requirements of CEQA, NEPA, the Water Right Applications, and all applicable permits. <br />Funding for HDR services have come from contributions by the City of Stockton, the City of <br />Lodi, and the MRWPA. The Authority is also looking to secure funding assistance through the <br />Congressional appropriations process, State grants, and other interested agencies. <br />In May 2004, the MRWPA completed Phase I – Reconnaissance Study of the MORE WATER <br />Project. Phase I evaluated all historic information available regarding the water right <br />applications, the FERC filings, Mokelumne River hydrology, and any past studies done on the <br />classic alternatives. From the information gained, the classic alternatives and other alternatives <br />meeting the MORE WATER Project purpose and need were conceptualized and evaluated. <br />The following alternatives were considered in Phase I: <br />• Pardee Dam and Reservoir Replacement/Enlargement <br />• Middle Bar Dam and Reservoir <br />• Mokelumne River Storage System Re-operation <br />• Devil’s Nose Dam and Reservoir Construction <br />• Duck Creek Reservoir – Pardee Diversion <br />• Duck Creek Reservoir – Camanche Diversion
The URL can be used to link to this page
Your browser does not support the video tag.