Laserfiche WebLink
SAN J 0 A Q I I I Irl Environmental Health Department <br /> CCUN r <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Address: Date: <br /> PAUL E VAZ TRUCKING INC 4740 E PELTIER RD,ACAMPO December 27, 2021 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 601 CFR 112.7 Failure of Plan to fulfill basic requirements including a cross-referencing section. <br /> OBSERVATION: The Spill Prevention, Control, and Countermeasure(SPCC)Plan reviewed at the time of <br /> inspection,dated 5/15/2019, did not follow the order or requirements of 40 CFR Part 112.7. The plan doesn't follow <br /> the required SPCC rule sequence and doesn't include adequate cross-reference. <br /> REGULATION GUIDANCE: If you are the owner or operator of a facility subject to this part you must prepare a Plan <br /> in accordance with good engineering practices.The Plan must have the full approval of management at a level of <br /> authority to commit the necessary resources to fully implement the Plan.You must prepare the Plan in writing. If you <br /> do not follow the sequence specified in this section for the Plan, you must prepare an equivalent Plan acceptable to <br /> the Regional Administrator that meets all of the applicable requirements listed in this part, and you must supplement <br /> it with a section cross-referencing the location of requirements listed in this part and the equivalent requirements in <br /> the other prevention plan. If the Plan calls for additional facilities or procedures, methods, or equipment not yet fully <br /> operational, you must discuss these items in separate paragraphs and must explain separately the details of <br /> installation and operational start-up. <br /> CORRECTIVE ACTION: Ensure that your SPCC Plan follows the required SPCC rule sequence and/or includes <br /> adequate cross-reference. Provide proof of correction to the EHD. <br /> This is a minor violation. <br /> 603 CFR 112.7(a)(3)Plan failed to adequately and accurately describe the physical layout of the facility. <br /> OBSERVATION: The Spill Prevention, Control, and Countermeasure(SPCC)Plan failed to adequately describe the <br /> physical layout of the facility. The facility diagram was missing storage areas of portable containers, piping and <br /> transfer area. <br /> REGULATION GUIDANCE: (3) Describe in your Plan the physical layout of the facility and include a facility diagram, <br /> which must mark the location and contents of each fixed oil storage container and the storage area where mobile or <br /> portable containers are located.The facility diagram must identify the location of and mark as"exempt" underground <br /> tanks that are otherwise exempted from the requirements of this part under§ 112.1(d)(4).The facility diagram must <br /> also include all transfer stations and connecting pipes, including intra-facility gathering lines that are otherwise <br /> exempted from the requirements of this part under§ 112.1(d)(11). You must also address in your Plan: <br /> (i)The type of oil in each fixed container and its storage capacity. For mobile or portable containers, either provide <br /> the type of oil and storage capacity for each container or provide an estimate of the potential number of mobile or <br /> portable containers,the types of oil, and anticipated storage capacities; <br /> CORRECTIVE ACTION: Immediately update the facility diagram to adequately and accurately describe the physical <br /> layout of the facility; submit proof of correction to the EHD. <br /> This is a Class II violation. <br /> FA0010337 PR0515786 SCO01 12/27/2021 <br /> EHD 28-01 Rev.12/06/2021 Page 7 of 14 Aboveground Petroleum Storage Act OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />