My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BUCKLEY COVE
>
4950
>
2300 - Underground Storage Tank Program
>
PR0231028
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2022 4:52:10 PM
Creation date
1/14/2022 8:54:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231028
PE
2361
FACILITY_ID
FA0003811
FACILITY_NAME
RIVER POINT LANDING MARINA-RESORT*
STREET_NUMBER
4950
STREET_NAME
BUCKLEY COVE
STREET_TYPE
WAY
City
STOCKTON
Zip
95219
APN
11820001
CURRENT_STATUS
01
SITE_LOCATION
4950 BUCKLEY COVE WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4950 Buckley Cove Way PR0231028 <br /> January 13, 2022 Program: UST <br /> PHOTO 2: Missing test date for overfill prevention on DO report. <br /> Underground Storage Tank <br /> Designated UST Operator Visual Inspection Report <br /> 0. TESTING AND MAINTENANCE Yes No NA Date last <br /> performed <br /> las monitoring system certification been completed within the past ❑✓ ❑ 1/22/21 <br /> 12 months? <br /> Has spill container testing been completed within the past ❑✓ ❑ 1122121 <br /> 12 months? <br /> Has overfill prevention equipment inspection been completed within ❑ ❑ <br /> the past 36 months? <br /> Has secondary containment testing been completed within the past ❑ ❑ 2/4/21 <br /> 36 months? <br /> Has tank tightness testing been completed within required El Eltimeframes? <br /> 1 07 <br /> Has line tightness testing been completed within the required ❑ El 11122121 <br /> timeframes? <br /> Other Test/Maintenance: ❑ ❑ 1 R73 <br /> Other Test/Maintenance: ❑ ❑ I El <br /> Other Test/Maintenance: ❑ ❑ ❑ <br /> 11. FACILITY EMPLOYEE TRAINING Yes No <br /> Have all individuals performing facility employee duties�receivedthe required facility <br /> employee training within the past 12 months? 0 ❑ <br /> 13. COMMENTS <br /> This section may be used to record comments or observations that are not current compliance <br /> deficiencies. <br /> All answers marked"No"must be described by the designated UST operator in Section 3., <br /> Lydia Baker, SR. REHS Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.