Laserfiche WebLink
4950 Buckley Cove Way PR0231028 <br /> January 13, 2022 Program: UST <br /> PHOTO 2: Missing test date for overfill prevention on DO report. <br /> Underground Storage Tank <br /> Designated UST Operator Visual Inspection Report <br /> 0. TESTING AND MAINTENANCE Yes No NA Date last <br /> performed <br /> las monitoring system certification been completed within the past ❑✓ ❑ 1/22/21 <br /> 12 months? <br /> Has spill container testing been completed within the past ❑✓ ❑ 1122121 <br /> 12 months? <br /> Has overfill prevention equipment inspection been completed within ❑ ❑ <br /> the past 36 months? <br /> Has secondary containment testing been completed within the past ❑ ❑ 2/4/21 <br /> 36 months? <br /> Has tank tightness testing been completed within required El Eltimeframes? <br /> 1 07 <br /> Has line tightness testing been completed within the required ❑ El 11122121 <br /> timeframes? <br /> Other Test/Maintenance: ❑ ❑ 1 R73 <br /> Other Test/Maintenance: ❑ ❑ I El <br /> Other Test/Maintenance: ❑ ❑ ❑ <br /> 11. FACILITY EMPLOYEE TRAINING Yes No <br /> Have all individuals performing facility employee duties�receivedthe required facility <br /> employee training within the past 12 months? 0 ❑ <br /> 13. COMMENTS <br /> This section may be used to record comments or observations that are not current compliance <br /> deficiencies. <br /> All answers marked"No"must be described by the designated UST operator in Section 3., <br /> Lydia Baker, SR. REHS Page 2 of 5 <br />