My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
2300 - Underground Storage Tank Program
>
PR0231952
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2022 11:08:46 AM
Creation date
1/19/2022 8:52:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231952
PE
2351
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
01
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> %f T11t-S <br /> P 9 <br /> Tank ID (one OPE per column) f <br /> Are both vent and tank riser piping es FKes es Yes <br /> secondarily contained? 0 No No No No <br /> OPE Model 71 SO 71 SO 71 SO <br /> What is the OPE response when but off ut off ut off ® Shut off <br /> activated? Flow Flow Flow Flow <br /> (Check all that apply.) Restricts ®Restricts <br /> ® Restricts Restricts <br /> Flow Flow Flow Flow <br /> El Audible ® Audible ® Audible Audible <br /> Alarm Alarm Alarm Alarm <br /> Visual ❑ Visual 17 Visual Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping Yes'" ®mss* r Yee ® Yes* <br /> that may interfere with the OPE operation? EKO F1 No o ❑ No <br /> At what level in the tank is the OPE set to <br /> activate? Inches from bottom of tank �U�� lob ICaC.� <br /> What is the percent capacity of the tank at 95 95 95 95 <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to es esu` es* ® Yes* <br /> respond when the stored substance ® No ® No ® No ® No <br /> reaches the designated regulatory level? <br /> ........E _,...... ,.m...�......< y <br /> OPE Inspection Results ass ass ass ® Pass <br /> ® Fail ® Fail Fail Fail <br /> Describe all answers marked No or"Fail"and proposed remeW <br /> r <br /> Y <br /> List all monitoring equipment either replaced or repaired. <br /> * Mark here if: <br /> pJ Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup reports) <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.