My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
8476
>
2300 - Underground Storage Tank Program
>
PR0541462
>
REMOVAL_2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2022 10:02:31 AM
Creation date
1/20/2022 9:50:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2016
RECORD_ID
PR0541462
PE
2361
FACILITY_ID
FA0023769
FACILITY_NAME
FAMILY RESIDENCE OF RODNEY D & LINDA D GAEDE
STREET_NUMBER
8476
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
8476 E KETTLEMAN LN
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II. GENERAL INFORMATION: <br />1. Obtain an EPA Site Number from the Department of Toxic Substances Control (800) 61 -TOXIC for <br />temporary hazardous waste removal activities associated with underground storage tank (UST) removals. <br />2. Disposal Information: SJC EHD's Underground Storage Tank Disposition Tracking Record (UST Tracking <br />Record. page 10) shall accompany each tank removed from site. Tank(s) will be issued an identification <br />number which EHD's representative will note on the UST Tracking Record. Contractor will affix same <br />identification number onto tank end using fluorescent spray paint. Contaminated tanks and/or piping are to <br />be transported under Hazardous Waste Manifest by a state registered hazardous waste hauler. <br />3. Contractor to Provide: Comb ustible/Fiammable gas detector (to verify the Lower Explosive Limit (LEL) <br />atmosphere and oxygen level of tank prior to lifting from excavation), adequate number(s) and appropriate <br />type(s) of fire extinguisher(s), barriers to secure the area as necessary to minimize traffic and pedestrian <br />interference, and fluorescent spray paint to affix tank identification numbers. it shall be the project <br />manager's responsibility for compliance with all health & safety regulations and requirements, which shall be <br />strictly adhered to at all times during the course of the closure activities. <br />4 The EHD permit shall be on site during tank excavation and removal. <br />5. Any changes in this document shall be approved by EHD prior to initiating work. <br />6. Closure -in -Place- If Closure -in -Place is the suggested method of abandonment, complete form EH 23 039 <br />and submit written approval from the local Fire Department_ <br />7. Temporary Closure: If Temporary Closure is the suggested method of abandonment, complete and <br />submit this application and include an explanation of how the UST owner/operator will comply with <br />California Code of Regulations Title 23, Section 2671 (a) -(e). Also, submit a written approval from the <br />local Fire Department. <br />8. The following documentation shall be submitted within 30 days of the tank removal <br />date: <br />a) Analytical results, mailed directly from laboratory to EHD, including a chain of custody and quality <br />assurance and quality control (QA & QC). <br />b) UST Tracking Record Sheet(s) and/or Tank Hazardous Waste Manifest(s) <br />C) Tank Closure Certification Form (DTSC form 1249). <br />d) Hazardous Waste Manifests for piping, rinsate, residual fuel, or waste oil receipt. <br />e) Submit the backfill excavation certificate as required by San Joaquin County and the incorporated <br />City Building Departments. This report will be referred to the appropriate agency for their review. <br />A site which has had UST(s) removed, shall not be considered for final closure until the above items <br />are submitted for review. <br />III. SITE MITIGATION: <br />In the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is the <br />responsibility of the owner or operator to submit a work plan to EHD Site Mitigation Unit and have it <br />approved prior to initiating any assessment or remediation activities. To minimize delays, the work plan <br />may be submitted concurrent with tank closure or installation plans. Address one copy of the work plan to <br />the Site Mitigation Unit for review. If the site is not currently in the Local Oversight Program, a billing form <br />and a $417 minimum fee must be submitted with the work plan For further assistance contact the Site <br />Mitigation Unit at (209) 468-3450. <br />EH 23 046 (Revised 7/26/2016) 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.