My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
1233
>
2300 - Underground Storage Tank Program
>
PR0547072
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2022 3:52:05 PM
Creation date
1/20/2022 4:39:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0547072
PE
2351
FACILITY_ID
FA0026688
FACILITY_NAME
7-ELEVEN STORE # 41342
STREET_NUMBER
1233
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
1233 E DR MARTIN LUTHER KING JR BLVD
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 5. MONITORING SYSTEM AND PROGRAMMING <br /> A separate Monitoring System Certification Form mast be prepared for each control panel. <br /> Make of Monitoring System Model of Monitoring System Software Version Installed <br /> Control Panel Control Panel <br /> Veeder Root TLS-350 na <br /> Attach the post-certification reports if the monitoring system is capable of generatng yes No NA <br /> either; AMonitoring System Set-up 0 Alarm History Report <br /> All rmonitoring equipment is operational per manufacturer's specifications? <br /> Secondary containment systems are free of damage, debris, or liquid? <br /> Are the audible and visual alarms operational? <br /> All sensors have been: 1) visually inspected for wiring kinks, breaks and residual <br /> buildup on floats; and 2) tested for functionality and confirmed operational? <br /> Are all sensors installed to detect a release at the earliest opportunity in the <br /> secondary containment? <br /> The monitoring system set-up was reviewed, and proper settings confirmed? <br /> Was the monitoring control panel's backup battery visually inspected, functionally A j Ll <br /> tested, and confirmed operational? <br /> Does the flow of fuel stop at the dispenser if a release is detected in the under- j J 0 <br /> dispenser containment? <br /> Does the turbine automatically shut down if the piping secondary containment <br /> monitoring system fails to operate or is electrically disconnected? <br /> Does the turbine automatically shut down if the piping secondary containment <br /> monitoring system detects a release? Which sensors initiate positive shut down? El <br /> (Chuck all that apply) Z Surnp LJ UDC <br /> If monitoring system alarms are relayed to a remote monitoring center, is all L] El R) <br /> communication equipment operational? <br /> Describe all answers marked "No`'or "Fail"and proposed remedy it Secdon 9. <br /> List all monitoring equipment either replaced or repairer!in Section 9 <br /> Page 2 if 6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.