My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
1233
>
2300 - Underground Storage Tank Program
>
PR0547072
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2022 3:52:05 PM
Creation date
1/20/2022 4:39:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0547072
PE
2351
FACILITY_ID
FA0026688
FACILITY_NAME
7-ELEVEN STORE # 41342
STREET_NUMBER
1233
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
1233 E DR MARTIN LUTHER KING JR BLVD
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 8. IN-TANK GAUGING TESTING <br /> Z Check this box if tank gauging is used only for inventory control. <br /> LJ Check this box if NO tank gauging equipment is installed. Yes No NA <br /> Do not complete this section if either,box is checked. <br /> All wiring has been: 1) visually inspected for kinks, breaks and proper entry and Li Ll Ll <br /> termination; and 2 tested for ground faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup Lj Li Ll <br /> to ensure that floats move freely, functionally tested, and confirmed operational? <br /> Was accuracy of system's product level readings tested? L-3 Ll Lj <br /> Was accuracy of system's water level readings tested? Ll Ll Ll <br /> Were all probes reinstalled properly? 0 Ll Ll <br /> Were all items on the equipment manufacturer's maintenance checklist completed? <br /> Probe lD Probe Model Tanks Monitored Pass Fail <br /> Q Li <br /> J1 Ll <br /> Q Lj <br /> Q Ll <br /> 19. COMMENTS <br /> ^Describe ail answers marker} "No"or 'Fail" and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> pre fuel monitor,sensors only tested. <br /> Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.