Laserfiche WebLink
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 16. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> T-1 RUL T-2 PUL Diesel <br /> Tank ID (one OPE per column) <br /> Are both vent and tank riser piping r Yes r:Yes r:Yes r Yes <br /> secondarily contained? r No r No r No r No <br /> OPE Model OPw oPw OPw <br /> Shut off Shut off Shut off Shut off <br /> Flow Flow Flow Flow <br /> Restricts Restricts Restricts Restricts <br /> What is the OPE response when activated? Flow Flow Flow Flow <br /> (Check all that apply) Audible Audible Audible Audible <br /> Alarm Alarm Alarm Alarm <br /> Visual I" Visual I" Visual Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping r Yes* r Yes* r Yes* r Yes* <br /> that may interfere with the OPE operation? r No r No r No r No <br /> At what level in the tank is the OPE set to 104 102.25 103.75 <br /> activate? (Inches from bottom of tank) <br /> What is the percent capacity of the tank at <br /> which the OPE activates? 93.5 93 93.6 <br /> Is the OPE in proper operating condition to r Yes r Yes r Yes r Yes <br /> respond when the stored substance reaches r No r No r No r No <br /> the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> G Pass r Pass r Pass r Pass <br /> OPE Inspection Results r Fail r Fail r Fail r Fail <br /> 8. COMMENTS <br /> Describe all results marked "Fail"and each proposed remedy. <br /> *Mark here if: <br /> f" Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br />