My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
2300 - Underground Storage Tank Program
>
PR0231416
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2022 10:24:25 AM
Creation date
1/24/2022 11:07:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231416
PE
2361
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
01
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C\\ <br /> tae ddix 5 <br /> 7150 Overfill Valve in Tank Shut off level Worksheet <br /> Important: This is meant to be supplemental worksheet and not a substitute to following the installation <br /> manual instructions. All length measurements are in inches. Please contact the Authority Having Jurisdic- <br /> tion(AHJ)and review local,state,and national codes to determine the regulatory requirements governing <br /> shut-off capacity in your region,as well as take Into account other considerations such as extreme tank tilt. <br /> Take the following measurements with the valve in- <br /> stalled In the tank: <br /> Distance from the 71 SO inlet tube flange to the cast <br /> lug in the 71 SO body(see figures),upper tube length. <br /> Mote: the Upper Tube Length must be at least 16"to in- <br /> clude the protective bend in the tube. <br /> Distance from the 71SO inlet tube€lange to the top and <br /> bottom of lower tube,valve length. <br /> (w)= 1 (D) <br /> (U)_ X112 Upper <br /> Tube <br /> Distance from the 7150 inlet tube flange to the bottom <br /> of the tank. Note:if a tank bottom protector is present it <br /> may be necessary to add this thickness to dimension <br /> (OPW 6111 b 61 TP models add 0.6") (W)Valve <br /> (B)_ length, <br /> bottom of <br /> From the tank calibration chart provided by tank manu- cut <br /> facturer find the dipstick number (Y)which corresponds <br /> to the 100%volume, {8} <br /> (y)= e 0 To Tank <br /> m <br /> 1. To determine shut-off percentage: rank <br /> Subtract upper tube length(D)from distance to tank {u}Valve Chart <br /> bottom(B) length, 10E11yo <br /> (X)=(B)—(D)-2"_._ 1S . ?�i top of cut Volume <br /> Dipstick <br /> Using the tank calibration chart provided by the tank <br /> manufacturer determine the tank capacity at the cal- <br /> culated(X)dimension and the 100%volume(Y)tank <br /> capacity. (� <br /> (X)tank capacity in gallons= <br /> (Y)tank capacity in gallons= Ccy'�)LL_ <br /> SO%=(X) capacity J(Y)capacity x1 fl0= -1) <br /> Note: The overfill valve must be installed per A.Hi retlu re <br /> inerts and all applicable local;state and nan-snat codes f <br /> :he overfill valve s set abo%e tl-e a owable shut-cff pence,t- <br /> �Ge the ovefil' ,calve mr.st be rerroved and replaced ~or <br /> re`erence 40 CGF.part-2AG.Subpart a Section 28o,2C OVE.'l! <br /> vafves 5Fo_jId be set tc 2 rrar TJn- f 953c <br />
The URL can be used to link to this page
Your browser does not support the video tag.