My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
2300 - Underground Storage Tank Program
>
PR0231416
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2022 10:24:25 AM
Creation date
1/24/2022 11:07:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231416
PE
2361
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
01
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM RETROFIT OR REPAIR <br /> ( Submit minimum of 3 sets of plans & applications as originals will be retained by EHD ) <br /> 1 . Site map enclosed ? YES [ ] NO [ ] <br /> 2 . Submit copies of ICC Service Technician and/or Installer' s certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced . Ensure a copy of the "Site Health and Safety <br /> Plan" is available on the jobsite as required by Title 8 . <br /> 3 . Detailed description of work to be completed . List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements . If repairing a component , describe how this will be done . ( If <br /> adding piping , UDC' s , or other UST equipment, or performing tank top upgrade , use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review) : <br /> REMOVE EXISTING UST 87 DROP TUBES AND INSTALL <br /> NEW FRANKLIN FUELS FFS - OPV OVERFILL PROTECTION VALVES . <br /> 4 . List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval ) : <br /> FRANKLIN FUELS FFS - OPV OVERFILL VALVES <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.