Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 9. COMMENTS <br /> Installed New Section of 87 Secondary Piping from 87 STP Sump to UDC 9/10-Retested& Passed. <br /> Inspector Vicky Vang-Lee Present. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 5 of 5 <br />