My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014681
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
25533
>
2600 - Land Use Program
>
PP-99-02
>
SU0014681
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2022 3:23:02 PM
Creation date
1/25/2022 9:25:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014681
PE
2600
FACILITY_NAME
PP-99-02
STREET_NUMBER
25533
Direction
S
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
TRACY
APN
20909037
ENTERED_DATE
12/27/2021 12:00:00 AM
SITE_LOCATION
25533 S MOUNTAIN HOUSE PKWY
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the <br /> acts of the <br /> the <br /> d ADT <br /> The 2000 Konlus other recently calculated <br /> or planned industriallbuildingsv in busine sspark, on <br /> ss <br /> auto auction, p <br /> nearby intersections and freeway segments("existing conditions plus project"). The study concluded <br /> that the traffic generated by the project would not impact any intersections. All nearby intersections <br /> would continue to operate at Level of Service (LOS) C or better, and all freewaysegments would <br /> continue to experience LOS D or better. <br /> The analysis then examined impacts on intersections and roadways in the area assuming year 2020 <br /> cumulative development conditions,with and without the project. Cumulative 2020 conditions are <br /> based on the San Joaquin Council of Governments and City of Tracy transportation model and land <br /> sp <br /> use projections,which include substantial growth in the Tracy and Mountain House communities. <br /> untain <br /> Without the project,2020 cumulative growth would cauatt c0 n Pass) freeway rS F conditions atamps oAddition of <br /> House Parkway and I-580Mountain House Parkway(P <br /> a traffic light at each ramp, plus right turn lanes at two of the ramps would reduce the LOS F <br /> conditions to an acceptable LOS D or better. <br /> ative year 0lt <br /> In addition, during cmRoad and Schulte Road at Mountain project conditions, the House Parkway)which are for cased <br /> intersections(Berkeley <br /> LOS F. Project traffic <br /> to degrade the intersection level of service to ffic would also affect operations <br /> along Schulte Road and Mountain House Parkway. <br /> be responsible for contributing a fair <br /> The Korve report riot omm lofse identified ds that the p ovementT project ps in the area that would be affected by p of <br /> share contribution <br /> traffic. These fair share contributions would include the costs of installing a traffic signal at the <br /> Berkeley Road/Mountain House Parkway intersection;installing traffic signals and some right tum <br /> lanes at the I 205/i�lountain House Parkway and 1-580/Mountain House Parkway(Patterson Pass) <br /> freeway ramps; and improving the existing signal at Schulte Road/Mountain House Parkway. The <br /> applicantat te ADI <br /> widening Mounts n Hofor <br /> us Parkendsway,constructinga new bridge over the Delta Mendota Canal, <br /> widening Schulte Road. <br /> On-Site Circulation <br /> The 1994 Special Purpose Plan includes a conceptual on-site y). The concepn plan tual) cor irculation ryrculat on pattern <br /> parcel (the land north of the Special Purpose Plan boundary). <br /> oad serving <br /> the loop a Fnorthern <br /> ire 8 portion of the business park <br /> includes a long public-maintained loop r <br /> property,with a series of cross-roads connecting p ( )' <br /> The 1994 circulation plan assumed that the remaining portion of the Tri-State/Cheng parcel would <br /> ent of the <br /> be subdivided and developed ins th Public loop road would noteous industrial lots. With the requiired,roposed since alcirculat on <br /> ADT Auto Auction on 204 p p lots. <br /> within the project site would be accomplished with private driveways and on private e modified <br /> To accommodate the auto auction site plan,the conceptual circulation plan would be modified to <br /> delete the public loop road system(Figure 8). <br /> -13- <br /> 93231-BO.spp00.wpd-828!00 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.