Laserfiche WebLink
REVISED STORM DRAINAGE FACILITIES Figure II <br /> FOR TRI-STATE/CHENG PARCEL <br /> Completed Detention Basin <br /> (Phase 111) <br /> i <br /> T <br /> ? 3 Discharge from <br /> Area"C" Detention Basin <br /> Drainage"B" Delete Earthen <br /> o Ditch(Pipe has been completed) <br /> / c o <br /> a Draina "A" Delete n <br /> i Temporary Detention Basin <br /> (Phase 1I) <br /> Public Storm /\ <br /> Drain Lines ` _ d <br /> Stub Out Here c 36" M21? <br /> 42 <br /> Is <br /> �. aio Clod' <br /> kp 13 42" Schulte Road <br /> 99Gc-0, 6 Safeway <br /> I Detention <br /> JJJ I Safeway', Basin <br /> r-1 r-1 <br /> Detention <br /> Basin <br /> 1 _ — <br /> Midwa — r — <br /> YRoad <br /> Legend <br /> 1994 Special Purpose Plan Boundary <br />• / / Amendment Area <br /> —r Surface Drainages <br /> 0 2000F <br /> Note:Proposed alignments are in generalized locations. <br /> I nr)glo0 <br />