Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 9. COMMENTS <br /> 87&91 Secondary Piping Failed, Cracks Found at Bravo Hubs at Dispensers 5&6 and 7&8. <br /> Diesel Secondary Piping Failed Due to Torn Test Boot-Replaced Test Boot-Retested and Passed. <br /> Diesel STP Sump Failed Due to Torn Test Boot-Replaced Test Boot-Retested and Passed. <br /> UDC 5&6 and 7&8 Failed Due to Cracked Conduit Penetrations. <br /> No Inspector Present. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 5 of 5 <br />