Laserfiche WebLink
Item No. 7 <br />PC: 4-18-85 <br />S-85-3 <br />Page 5 <br />dards for a 70 -foot right-of-way road. Edgewater Court <br />shall be fully improved to County standard for a 50 -foot <br />right-of-way road. Curbs, gutters, and sidewalks shall be <br />provided for both Edgewater Court and Country Club <br />Boulevard. <br />c. A secondary emergency access road shall be provided to the <br />subdivision. <br />d. Public water supply, sanitary sewer, and storm drainage <br />systems shall be provided. Agreements with applicable <br />agencies to provide services for water, sanitary sewer, and <br />storm drainage shall be obtained prior to the approval of <br />filing the Final Map. <br />(1) The storm drainage system shall conform to County stan- <br />dards, and the sanitary sewer system shall conform to <br />City of Stockton standards. <br />(2) The water system shall conform to the requirements of <br />the Local Health District and the County Department of <br />Public Works. An adequate water supply for fire pro- <br />tection with fire hydrants and connection shall be <br />installed in conformance with the requirements of the <br />County Fire Warden and the Country Club Fire District. <br />e. Street lighting shall be provided, and the subdivision area <br />shall annex to the West Stockton Lighting District for <br />maintenance of systems. <br />f. A physical barrier shall be constructed on the east property <br />boundary to differentiate from the Amblers Club private <br />access road. <br />■ ■ r <br />