My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
620
>
2300 - Underground Storage Tank Program
>
PR0231058
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2023 11:32:55 AM
Creation date
1/27/2022 8:29:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231058
PE
2361
FACILITY_ID
FA0003738
FACILITY_NAME
CHARTER WAY SHELL*
STREET_NUMBER
620
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
Stockton
Zip
95206
APN
16504007
CURRENT_STATUS
01
SITE_LOCATION
620 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Health Department <br />Underground Storage Tank Program Inspection Report <br />Date: <br />November 01, 2022 <br /> Facility Address: <br /> 620 W DR MARTIN LUTHER KING JR BLVD, <br /> Facility Name: <br /> CHARTER WAY SHELL* <br />SUMMARY OF VIOLATIONS <br />(CLASS I, CLASS II, or MINOR - Notice to Comply) <br />RemarksItem # <br /> 208 CCR 2716(a-e) Failure to comply with the designated operator inspection requirements. <br />OBSERVATION: The designated operator failed to check and note all required items on the visual inspection <br />reports. The incorrect and missing information included the following from the inspection reports: <br />-Mechanical float mechanisms in the UDC's were not checked off <br />REGULATION GUIDANCE: During the visual inspection, the designated operator shall check that all required <br />testing and maintenance for the UST system have been completed and shall check all required items on the report. <br />CORRECTIVE ACTION: Ensure that designated operators performing visual inspections at this facility are including <br />all of the required information on the reports. <br />-------------------------------------------------------------- <br />OBSERVATION: Designated operator reports were not signed within the required time frame. <br />-The owner/operator did not sign the designated operator reports for 11/5/21. <br />REGULATORY GUIDANCE: Within 48 hours of the completion of the designated UST operator visual inspection, <br />the designated operator shall sign and provide the owner or operator with a copy of the inspection report. Within 72 <br />hours of being provided a signed copy of the report, the owner or operator shall provide a description of each <br />corrective action taken or to be taken and shall sign and date the report, acknowledging the identified compliance <br />issues. <br />CORRECTIVE ACTION: Ensure all designated operator inspection reports are completed and signed within the <br />required time frame in the future. <br />This is a repeat violation, Class II. <br />Overall Inspection Comments: <br />Complete and submit a copy of the Return to Compliance Certification form to the EHD with a statement <br />documenting the corrective actions that have been or will be taken for each violation, and any supporting <br />paperwork, by 12/1/2022. <br />To minimize person to person contact EHD is choosing to write the name of person receiving the report instead <br />of having them sign. Starting September 1, 2018, all in-office CERS help will be provided at EHD hourly rate <br />($156). To schedule an appointment, please call (209) 468-3420. <br />AFTER THE COMPLIANCE DATE, EHD WILL BILL FOR ALL TIME AND ACTIVITIES ASSOCIATED WITH BRINGING <br />THIS FACILITY BACK INTO COMPLIANCE. <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> Received by: Inspector Phone: <br /> GABRIELA GARCIA-MEJIA, EH Specialist <br /> Inspector:November 01, 2022 Date: <br />Printed Name and Title: <br />Emailed to Suki Singh, Owner <br />(209) 616-3037 <br />FA0003738 PR0231058 SC001 11/01/2022 <br />EHD 23-01 Rev. 9/16/2020 Underground Storage Tank Program OIRPage 5 of 5 <br />1868 E. Hazelton Avenue | Stockton, California 95205 | T 209 468-3420 | F 209 464-0138 | www.sjgov.org/EHD
The URL can be used to link to this page
Your browser does not support the video tag.