Laserfiche WebLink
i <br /> RECEIVED BY EHD VIA EMAIL: <br /> 2/23/2022 <br /> UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM (Pagn 5 of 6) <br /> XVII. FILL RISER SUMP TESTING INFORMATION <br /> Manufacturer Idenh Tank ID from Section III for each Manufacturer C❑ D❑ <br /> A ❑ _ <br /> A❑ Et❑ C❑ D❑ B❑ <br /> Test Method Used ❑Manufacturer Gudel nes(Specify). <br /> ❑Industry Code or Engineering Standard(Specify) <br /> ❑Engineered Melhod(Specify). <br /> #of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. <br /> Fill Riser Sump Testing Training and Certifications(List applicable certifications) <br /> Expiration Date <br /> XVIII. COMMENTS <br /> Prov,de any additional comments here <br /> NA-Section III-Fill Riser Sumps are present,but were not tested. <br /> XIX. VENT I TRANSITION SUMP TESTING INFORMATION <br /> Manufacturer I Idents Vent/Transition Sum ID from Section III for each Manufacturer <br /> a ❑ I b❑ c❑ d ❑ <br /> a❑ b❑ c❑ d ❑ <br /> Test Method Used: ❑Manufacturer Guidelines(Specify) <br /> ❑Industry Code or Engineering Standard(Specify), <br /> ❑Engineered Method(Specify) <br /> #of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. <br /> Vent i Transition Sump Testing Training and Certifications(List applicable certifications) Expiration Date <br /> XX. COMMENTS <br /> Provide any additional comments here <br /> NA-Section III-No Vent/Transition Sump present at this UST Facility. <br /> D•hertillration <br />